Search for collections on EPrints Repository UNTIRTA

ANALISIS KOMPETENSI SUMBER DAYA MANUSIA PADA PROYEK KONSTRUKSI TERHADAP KINERJA WAKTU PROYEK (Studi Kasus: Proyek Bangunan Gedung Facility Support Telkomsel Smart Office (FSTSO))

Rizqi Septyani Putri Hartoyo, Tasya (2025) ANALISIS KOMPETENSI SUMBER DAYA MANUSIA PADA PROYEK KONSTRUKSI TERHADAP KINERJA WAKTU PROYEK (Studi Kasus: Proyek Bangunan Gedung Facility Support Telkomsel Smart Office (FSTSO)). S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa.

[img] Text (Fulltext)
TASYA RIZQI SPH_3336210033_Fulltext.pdf
Restricted to Registered users only

Download (28MB) | Request a copy
[img] Text (Bab 1)
TASYA RIZQI SPH_3336210033_01.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (Bab 2)
TASYA RIZQI SPH_3336210033_02.pdf
Restricted to Registered users only

Download (345kB) | Request a copy
[img] Text (Bab 3)
TASYA RIZQI SPH_3336210033_03.pdf
Restricted to Registered users only

Download (785kB) | Request a copy
[img] Text (Bab 4)
TASYA RIZQI SPH_3336210033_04.pdf
Restricted to Registered users only

Download (539kB) | Request a copy
[img] Text (Bab 5)
TASYA RIZQI SPH_3336210033_05.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (Bab 6)
TASYA RIZQI SPH_3336210033_06.pdf
Restricted to Registered users only

Download (309kB) | Request a copy
[img] Text (Daftar Referensi)
TASYA RIZQI SPH_3336210033_Ref.pdf
Restricted to Registered users only

Download (213kB) | Request a copy
[img] Text (Lampiran)
TASYA RIZQI SPH_3336210033_Lamp.pdf
Restricted to Registered users only

Download (25MB) | Request a copy
[img] Text (Cek Plagiasi)
TASYA RIZQI SPH_3336210033_CP.pdf
Restricted to Registered users only

Download (26MB) | Request a copy

Abstract

Construction projects require various resources, including Human Resource(HR). Incompetent HR can reduce project performance and cause problems such as delays in completion. One important aspect of HR is competence, which has certain standards such as the Indonesian National Work Competency Standards (SKKNI). This research aims to identify the HR competencies needed in construction projects and analyze their influence and relations to time performance. The research was conducted on a building project in South Jakarta using a quantitative approach with questionnaire distribution and expert analysis. Data were analyzed using non-parametric and descriptive methods. The results showed that the Facility Support Telkomsel Smart Office (FSTSO) project required 23 technical competencies (hard skills) and 28 non-technical competencies (soft skills). The most dominant hard skill ability are understanding the technical implementation of structural work (X1.13) and the ability to make information materials and instructions to subordinates (X1.4). The most dominant soft skill is being proactive and showing initiative (X2.15). Technical competencies significantly influence time performance by 60,7%, while non-technical competencies contribute 56.8%. The results indicate that improving worker competencies can lead to better time performance in construction projects.

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
Thesis advisorAsyiah, Siti198601312019032009
Thesis advisorAbdu Asy Syahid, Mush`ab199308012022031004
Uncontrolled Keywords: Hard Skills, Soft Skills, Project Time Performance
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: 03-Fakultas Teknik > 22201-Jurusan Teknik Sipil
Depositing User: Tasya Rizqi Septyani Putri Hartoyo
Date Deposited: 17 Jul 2025 01:31
Last Modified: 17 Jul 2025 01:31
URI: http://eprints.untirta.ac.id/id/eprint/51847

Actions (login required)

View Item View Item