Search for collections on EPrints Repository UNTIRTA

ANALISIS RISIKO KESEHATAN DAN KESELAMATAN KERJA PADA PROYEK PLTU SURALAYA DENGAN METODE HOUSE OF RISK (HOR)

Manurung, Ledis (2025) ANALISIS RISIKO KESEHATAN DAN KESELAMATAN KERJA PADA PROYEK PLTU SURALAYA DENGAN METODE HOUSE OF RISK (HOR). S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa.

[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_Fulltext.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_01.pdf
Restricted to Registered users only

Download (700kB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_02.pdf
Restricted to Registered users only

Download (427kB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_03.pdf
Restricted to Registered users only

Download (130kB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_04.pdf
Restricted to Registered users only

Download (753kB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_05.pdf
Restricted to Registered users only

Download (289kB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_06.pdf
Restricted to Registered users only

Download (80kB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_Ref.pdf
Restricted to Registered users only

Download (204kB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_Lamp.pdf
Restricted to Registered users only

Download (403kB)
[img] Text (SKRIPSI)
Ledis Inriani Manurung_3333200036_CP.pdf
Restricted to Registered users only

Download (14MB)

Abstract

The construction project of the Jawa 9 and 10 Suralaya Coal-Fired Power Plant (PLTU) is a large-scale construction work with a high risk of occupational accidents. Challenges in Occupational Health and Safety (OHS) risk management affect worker safety, project efficiency, and corporate sustainability. To reduce risks, analysis and mitigation efforts are necessary to minimize negative impacts. This study aims to identify risk events and risk agents in the construction project of the Jawa 9 and 10 Suralaya PLTU and determine mitigation priorities using the House of Risk (HOR) method. The research employs the House of Risk (HOR) method to identify, analyze, evaluate, and determine risk mitigation actions. The findings indicate 29 risk events and 40 risk agents, with five priority risk sources: A12, A35, A1, A26, and A13, along with nine mitigation actions proposed to the company for prioritizing the mitigation of critical risk agents.

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
Thesis advisorWAHYUNI, NURAIDA198409062008122001
Thesis advisorSONDA, ATIA196501281995031004
Additional Information: Proyek pembangunan PLTU Jawa 9 dan 10 Suralaya merupakan pekerjaan konstruksi berskala besar dengan risiko kecelakaan kerja yang tinggi. Tantangan dalam manajemen risiko Keselamatan dan Kesehatan Kerja (K3) mempengaruhi keselamatan pekerja, efisiensi proyek, dan keberlanjutan perusahaan. Untuk mengurangi risiko, diperlukan analisis dan mitigasi guna meminimalisasi dampak negatif. Penelitian ini bertujuan untuk mengidentifikasi kejadian risiko (risk event) dan penyebab risiko (risk agent) dalam proyek pembangunan PLTU Jawa 9 dan 10 Suralaya serta menentukan prioritas mitigasi menggunakan metode House of Risk (HOR). Penelitian ini menggunakan metode House of Risk (HOR) untuk melakukan identifikasi, analisis, evaluasi dan penentuan aksi mitigasi risiko. Hasil penelitian menunjukkan terdapat 29 kejadian risiko (risk event) dan 40 penyebab risiko (risk agent), dengan 5 sumber risiko prioritas yaitu A12, A35, A1, A26, dan A13 serta 9 aksi mitigasi yang akan diusulkan kepada pihak perusahaan untuk penyebab risiko (risk agent) yang menjadi prioritas untuk dimitigasi.
Subjects: T Technology > T Technology (General)
Divisions: 03-Fakultas Teknik
03-Fakultas Teknik > 26201-Jurusan Teknik Industri
Depositing User: Ledis Inriani Manurung
Date Deposited: 27 Feb 2025 02:19
Last Modified: 27 Feb 2025 07:52
URI: http://eprints.untirta.ac.id/id/eprint/47471

Actions (login required)

View Item View Item