DHARMAWAN, YOGA (2024) ANALISA PRODUKTIVITAS PEKERJA DENGAN METODE TIME STUDY PADA PEKERJAAN KOLOM (Studi kasus pada Proyek Pembangunan Universitas Pamulang Serang). S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa.
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_Fulltext.pdf Restricted to Registered users only Download (28MB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_01.pdf Restricted to Registered users only Download (3MB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_02.pdf Restricted to Registered users only Download (4MB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_03.pdf Restricted to Registered users only Download (2MB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_04.pdf Restricted to Registered users only Download (778kB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_05.pdf Restricted to Registered users only Download (5MB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_06.pdf Restricted to Registered users only Download (307kB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_CP.pdf Restricted to Registered users only Download (9MB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_Lamp.pdf Restricted to Registered users only Download (21MB) | Request a copy |
![]() |
Text (SKRIPSI)
YOGA DHARMAWAN_3336200042_Ref.pdf Restricted to Registered users only Download (492kB) | Request a copy |
Abstract
This research discusses the value of worker productivity in building column work, there are several factors that affect the value of worker productivity, the value of productivity will affect various aspects of construction projects, including completion time, cost, and quality, therefore the organizers of construction projects must know the value of worker productivity when doing work. The research was conducted by conducting field observations to obtain column work time which was then analyzed using the Time Study method to determine the value of worker productivity and work costs. The results showed that the productivity value of Pamulang University column work was obtained in column reinforcement work of 544.07 kg/OH, in column formwork work of 42.01 m2/OH, in column casting work of 57.05 m3/OH, and in formwork dismantling work of 170.38 m2/OH. Factors that hinder productivity in Pamulang University column work, namely in column reinforcement work is the number of workers, in column formwork work is the number of workers and the position of workers, in column casting work is the number of workers, and in column formwork dismantling work is the position of workers and the number of workers. The cost required per column in the Pamulang University Development project is Rp6,727,870.00.
Item Type: | Thesis (S1) | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
|||||||||
Additional Information: | Penelitian ini membahas tentang nilai produktivitas pekerja pada pekerjaan kolom bangunan gedung, ada beberapa faktor yang mempengaruhi nilai produktivitas pekerja, nilai produktivitas akan berpengaruh pada berbagai aspek proyek konstruksi, termasuk waktu penyelesaian, biaya, dan kualitas, oleh karena itu pihak penyelenggara proyek konstruksi harus mengetahui nilai produktivitas pekerja saat melakukan pekerjaan. Penelitian dilakukan dengan melakukan observasi lapangan untuk memperoleh waktu pekerjaan kolom yang kemudian dilakukan analisis data menggunakan metode Time Study untuk mengetahui nilai produktivitas pekerja dan biaya pekerjaan. Hasil penelitian menunjukkan bahwa Nilai produktivitas pada pekerjaan kolom Universitas Pamulang, didapat pada pekerjaan penulangan kolom sebesar 544,07 kg/OH, pada pekerjaan bekisting kolom sebesar 42,01 m2/OH, pada pekerjaan pengecoran kolom sebesar 57,05 m3/OH, dan pada pekerjaan pembongkaran bekisting sebesar 170,38 m2/OH. Faktor-faktor yang menghambat produktivitas pada pekerjaan kolom Universitas Pamulang, yaitu pada pekerjaan penulangan kolom adalah jumlah pekerja, pada pekerjaan bekisting kolom adalah jumlah pekerja dan posisi pekerja, pada pekerjaan pengecoran kolom adalah jumlah pekerja, dan pada pekerjaan pembongkaran bekisting kolom adalah posisi pekerja dan jumlah pekerja. Biaya yang diperlukan per kolom pada proyek Pembangunan Universitas Pamulang adalah Rp6,727,870.00. | |||||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | |||||||||
Divisions: | 03-Fakultas Teknik > 22201-Jurusan Teknik Sipil | |||||||||
Depositing User: | Mr YOGA DHARMAWAN | |||||||||
Date Deposited: | 22 Aug 2024 16:28 | |||||||||
Last Modified: | 22 Aug 2024 16:28 | |||||||||
URI: | http://eprints.untirta.ac.id/id/eprint/41263 |
Actions (login required)
![]() |
View Item |