Search for collections on EPrints Repository UNTIRTA

ANALISIS SUSTAINABLE VALUE STREAM MAPPING UNTUK MENINGKATKAN KINERJA KEBERLANJUTAN PERUSAHAAN (STUDI KASUS: PKS KERTAJAYA PT PERKEBUNAN NUSANTARA VIII)

RIAHASTIKA, WINI (2024) ANALISIS SUSTAINABLE VALUE STREAM MAPPING UNTUK MENINGKATKAN KINERJA KEBERLANJUTAN PERUSAHAAN (STUDI KASUS: PKS KERTAJAYA PT PERKEBUNAN NUSANTARA VIII). S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa.

[img] Text (SKRIPSI)
Wini Riahastika_3333200022_Fulltext.pdf
Restricted to Registered users only

Download (5MB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_01.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_02.pdf
Restricted to Registered users only

Download (653kB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_03.pdf
Restricted to Registered users only

Download (318kB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_04.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_05.pdf
Restricted to Registered users only

Download (306kB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_06.pdf
Restricted to Registered users only

Download (189kB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_Ref.pdf
Restricted to Registered users only

Download (281kB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_Lamp.pdf
Restricted to Registered users only

Download (3MB)
[img] Text (SKRIPSI)
Wini Riahastika_3333200022_CP.pdf
Restricted to Registered users only

Download (43MB)

Abstract

Sustainable manufacturing in companies obtained by consider three dimensions of sustainability, namely; economic, environmental and social. Sustainable Value Stream Mapping (Sus-VSM) is a visual tool for identifying sources of waste in production process based on the three dimensions of sustainability. This research aims to analyzed company performance with Sus-VSM. The case study in this research is the CPO production process at PKS Kertajaya PT Perkebunan Nusantara VIII. The results showed that efficiency obtained in various indicators of sustainability dimensions includes; economic (product quality 94.68%, time 87.94%), environmental (material consumption 20.77%, water 97.28%, energy 8.62%, solid waste 21.92%, liquid waste 56.48%, and gas waste, with chimney boilers and incinerators made more than 18 m to reduce air pollution), and social (health 91.18%, highest PLI score at Loading Ramp station 28.73, and noise level 80.2-83.7 db(A), vibration less than 2 Hz, temperature 24,6℃ and employee training once). The research was recommended material requirements planning using the MRP system, schedule equipment and machine maintenance, checking the quality of raw materials, hold training on oil palm replanting, employee training regarding quality objectives, environmental, K3, company plans, machines use and socialization ergonomics, improve road surface access, and integrate infrastructure management and monitoring of environmental condition.

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
UNSPECIFIEDFEBIANTI, EVI197905022003122001
UNSPECIFIEDGUNAWAN, AKBAR198309282014041001
Additional Information: Manufaktur berkelanjutan pada perusahaan dapat diwujudkan dengan mempertimbangkan tiga dimensi berkelanjutan, yaitu ekonomi, lingkungan, dan sosial. Sustainable Value Stream Mapping (Sus-VSM) adalah alat visual untuk mengidentifikasi sumber pemborosan pada proses produksi berdasarkan tiga dimensi berkelanjutan tersebut. Penelitian ini bertujuan untuk menganalisis kinerja perusahaan dengan Sus-VSM. Studi kasus pada penelitian ini adalah proses produksi CPO di PKS Kertajaya PT Perkebunan Nusantara VIII. Hasil penelitian menunjukkan bahwa tingkat efisiensi yang diperoleh pada berbagai indikator dimensi keberlanjutan diantaranya; ekonomi (kualitas produk 94,68%, waktu 87,94%), lingkungan (konsumsi material 20,77%, air 97,28%, energi 8,62%, limbah padat 21,92%, limbah cair 56,48%, dan limbah gas dilakukan upaya pengurangan polusi udara dengan chimney boiler dan insenerator dibuat lebih dari 18 m tingginya), serta sosial (kesehatan 91,18%, skor tertinggi PLI pada stasiun Loading Ramp 28,73, serta tingkat kebisingan 80,2-83,7 db(A), getaran kurang dari 2 Hz, suhu 24,6℃, dan pelatihan karyawan dilaksanakan sekali). Penelitian ini merekomendasikan perencanaan kebutuhan material dengan sistem MRP, menjadwalkan perawatan peralatan dan mesin, memperketat pengecekan kualitas bahan baku, mengadakan pelatihan mengenai pentingnya replanting kelapa sawit, pelatihan karyawan terkait sasaran mutu, lingkungan, K3, rencana perusahaan, penggunaan mesin dan sosialisasi ergonomi, memperbaiki akses permukaan jalan, serta mengintegrasikan pengelolaan infrastruktur dan pengawasan kondisi lingkungan.
Subjects: Q Science > Q Science (General)
T Technology > TD Environmental technology. Sanitary engineering
T Technology > TS Manufactures
Divisions: 03-Fakultas Teknik
03-Fakultas Teknik > 26201-Jurusan Teknik Industri
Depositing User: Mrs Wini Riahastika
Date Deposited: 26 Jul 2024 15:23
Last Modified: 26 Jul 2024 15:23
URI: http://eprints.untirta.ac.id/id/eprint/39635

Actions (login required)

View Item View Item