Maddepungeng, Andi and Bethary, Rindu Twidi and CHASANAH, USWATUN
(2016)
ANALISIS PERBANDINGAN RISIKO BIAYA KONSTRUKSI ANTARA KONTRAK LUMPSUM DAN UNIT PRICE MENGGUNAKAN METODE ANALYTIC HIERARCHY
PROCESS (AHP) DAN DECISSION TREE
(POHON KEPUTUSAN).
Jurnal Konstruksia, 8 (1).
pp. 17-31.
ISSN 2302-4976