Damayanti Safitri, Tri (2025) PRODUKTIVITAS TOWER CRANE PADA PROYEK PEMBANGUNAN APARTEMEN ELEVEE PENTHOUSES AND RESIDENCES. S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa.
![]() |
Text (Fulltext)
Tri Damayanti Safitri_3336200022_Fulltext.pdf Restricted to Registered users only Download (22MB) | Request a copy |
![]() |
Text (Bab 1)
Tri Damayanti Safitri_3336200022_01.pdf Download (1MB) |
![]() |
Text (Bab 2)
Tri Damayanti Safitri_3336200022_02.pdf Restricted to Registered users only Download (563kB) | Request a copy |
![]() |
Text (Bab 3)
Tri Damayanti Safitri_3336200022_03.pdf Restricted to Registered users only Download (530kB) | Request a copy |
![]() |
Text (Bab 4)
Tri Damayanti Safitri_3336200022_04.pdf Restricted to Registered users only Download (454kB) | Request a copy |
![]() |
Text (Bab 5)
Tri Damayanti Safitri_3336200022_05.pdf Restricted to Registered users only Download (1MB) | Request a copy |
![]() |
Text (Bab 6)
Tri Damayanti Safitri_3336200022_06.pdf Restricted to Registered users only Download (168kB) | Request a copy |
![]() |
Text (Daftar Referensi)
Tri Damayanti S._3336200022_Ref.pdf Restricted to Registered users only Download (198kB) | Request a copy |
![]() |
Text (Daftar Lampiran)
Tri Damayanti S._3336200022_Lamp.pdf Restricted to Registered users only Download (17MB) | Request a copy |
![]() |
Text (Cek Plagiasi)
Tri Damayanti Safitri_3336200022_CP.pdf Restricted to Registered users only Download (66MB) | Request a copy |
Abstract
In the running of a project in the field of civil engineering, the use of heavy equipment is inevitable because heavy equipment is a factor that greatly affects the success of a project in terms of completing work on time as prescribed. In construction projects, the work time must be carried out appropriately based on the design that has been agreed upon by the owner and the implementing contractor so that there are no delays in the construction of the construction project. The objective of this study is to determine the efficiency, productivity, and operational costs of the tower crane. The research was conducted on the construction project of Elevee Penthouses and Residences. Data collection was carried out through observations of the tower crane over a period of six days. The data analysis method used is quantitative. From the results of data analysis that has been carried out during the research period, it is known that the efficiency of tower cranes in tower 1 obtained an average efficiency of 0.88. Meanwhile, the efficiency of tower cranes in tower 2 obtained an average efficiency of 0.87. For the productivity of tower cranes in tower 1, the average productivity is 1979.86 kg/hour. Meanwhile, tower 2 obtained an average productivity of 1823.47 kg/hour. So that from the productivity of the two tower cranes, a ratio of 1 : 0.92 was obtained. The operational cost of the tower crane in tower 1 is Rp. 617.546,76/hour. Meanwhile, the operational cost of the tower crane in tower 2 obtained an operational cost of Rp. 605.497,46/hour.
Item Type: | Thesis (S1) | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
|||||||||
Uncontrolled Keywords: | Heavy Machinery, Productivities, Tower Crane, Cycle Time, Efficiency | |||||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
|||||||||
Divisions: | 03-Fakultas Teknik > 22201-Jurusan Teknik Sipil | |||||||||
Depositing User: | Tri Damayanti Safitri | |||||||||
Date Deposited: | 24 Jul 2025 03:57 | |||||||||
Last Modified: | 24 Jul 2025 03:57 | |||||||||
URI: | http://eprints.untirta.ac.id/id/eprint/52338 |
Actions (login required)
![]() |
View Item |