eprintid: 52759 rev_number: 30 eprint_status: archive userid: 23161 dir: disk0/00/05/27/59 datestamp: 2025-07-28 02:53:50 lastmod: 2025-07-28 02:53:50 status_changed: 2025-07-28 02:53:50 type: thesis metadata_visibility: show contact_email: 3332200061@untirta.ac.id creators_name: Ardani, Bustomi creators_id: 3332200061 contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: Alfanz, Rocky contributors_name: Nugraha, Adi contributors_id: 198103282010121001 contributors_id: 199507082022031009 corp_creators: UNIVERSITAS SULTAN AGENG TIRTAYASA corp_creators: FAKULTAS TEKNIK corp_creators: JURUSAN TEKNIK ELEKTRO title: Analisis Kelayakan Setting Relay OCR dan GFR Di Sistem Distribusi 20 kV Dengan Transformator 200 kVA PT Trafoindo Prima Perkasa ispublished: pub subjects: TK divisions: Elektro full_text_status: restricted abstract: Gangguan hubung singkat merupakan salah satu penyebab utama kerusakan transformator pada sistem distribusi tenaga listrik. Penelitian ini bertujuan untuk mengetahui kelayakan sistem proteksi pada transformator 200 kVA di jaringan distribusi 20 kV melalui simulasi berbasis software ETAP 19.0.1. Transformator sebelumnya mengalami ledakan akibat gangguan hubung singkat yang tidak berhasil diputus oleh sistem proteksi eksisting. Analisis Kelayakan dilakukan melalui evaluasi koordinasi kendali Over Current Relay (OCR) dan Ground Fault Relay (GFR), baik pada sisi Incoming maupun Outgoing, dengan fokus pada nilai pick up current dan Time Delay. Pada setting awal koordinasi relay diketahui tidak mampu merespons gangguan secara selektif berdasarkan zona proteksi yang diharapkan. Simulasi dilakukan menggunakan modul Load Flow Analysis dengan koordinasi kurva Time-Current Characteristic (TCC) untuk mengalami gangguan hubung singkat tiga fasa dan satu fasa ke tanah. Setelah dilakukan hasil perhitungan dan simulasi ulang sebanyak empat kali untuk validasi hasil, diperoleh setting optimal pada relay dengan: OCR Incoming sebesar 4,3301 A (delay 0,7 detik), OCR Outgoing 5,196 A (delay 0,3 detik), GFR Incoming 0,7261 A (delay 0,6 detik), dan GFR Outgoing 0,886 A (delay 0,3 detik). Hasil perhitungan dan simulasi menunjukkan bahwa pengaturan setting relay ini mampu memutus arus gangguan tiga fasa dengan arus gangguan sebesar 6,981 kA dan gangguan satu fasa ke tanah 6,973 kA secara selektif dan sesuai standar IEC 60255. Dengan demikian, optimasi setting relay berbasis simulasi ETAP terbukti meningkatkan keandalan sistem proteksi transformator sesuai dengan standar IEC 60076. date: 2025-06-12 date_type: published pages: 92 institution: Fakultas Teknik Universitas Sultan Ageng Tirtayasa department: Teknik Elektro thesis_type: sarjana thesis_name: sarjana referencetext: A. Zain and R. C. Afwan, “Analisis Gangguan Arus Hubung Singkat Trafo Distribusi 48-PT-33-7 Menggunakan ETAP (Studi Kasus Di Perumahan PT. Badak NGL),” J. Tek. Mesin Sinergi, vol. 17, no. 2, pp. 99–116, 2020, doi: 10.31963/sinergi.v17i2.2073. U. Faruq, A. Ridho, M. Vrayulis, and E. Julio, “Analisa Aliran Daya pada Sistem Tenaga Listrik menggunakan ETAP 12.6 Umar,” SainETIn (Jurnal Sain, Energi, Teknol. Ind., vol. 6, no. 1, pp. 16–22, 2021, doi: 10.31849/ sainetin.v6i1.7031. S. Haryudo, Kartini Unit, and Kholis Nur, “Analisis Hubung Singkat Pada Sistem Distribusi 20 kV PT. Pertamina Ep Asset 4 Field Cepu Distrik Ledok Menggunakan ETAP 12.6.0,” J. Tek. Elektro, vol. 10, no. 3, pp. 699–706, 2021. A. Vafadar, M. A. Hejazi, H. Hashemi-Dezaki, and N. Mohagheghi, “Optimal Protection Coordination of Active Distribution Networks Using Smart Selection of Short Circuit Voltage-Based Relay Characteristics,” Energies, vol. 16, no. 14, pp. 0–18, 2023, doi: 10.3390/en16145301. T. R. Zainal Sya’roni, “Analisis Ketidakseimbangan Beban Transformator Distribusi 20 Kv Dan Solusinya Pada Jaringan Tegangan Rendah,” J. Tek. Elektro, vol. 08, no. 1, pp. 173–180, 2019, doi: https://doi.org/10.26740/jte. v8n1.p%25p. F. Gumilang, B. P. Purnomo, and I. T. Prakoso, “Analisis Koordinasi Sistem Proteksi Menggunakan Software Etap Untuk Meningkatkan Keandalan Jaringan Distribusi Listrik 20 Kv Pada Perusahaan Yang Bergerak Di Bidang Pengolahan Makanan,” J. Tek. Elektro, vol. 7, no. 2, p. 74, 2023, doi: 10.31000/jte.v7i2.9808. B. Perea-Mena, J. A. Valencia-Velasquez, J. M. López-Lezama, J. B. Cano Quintero, and N. Muñoz-Galeano, “Circuit breakers in Low- and Medium Voltage DC Microgrids for Protection against Short-Circuit Electrical Faults: Evolution and Future Challenges,” Appl. Sci., vol. 12, no. 1, 2022, doi: 10.3390/app12010015. [8] [9] H. Widiarto, “Analisis Aliran Daya Pada Sistem Tenaga Listrik Di Bandara Internasional Supadio Menggunakan Software Etap 19,” Knowl. J. Inov. Has. Penelit. dan Pengemb., vol. 3, no. 4, pp. 307–318, 2023, doi: 10.51878/knowledge.v3i4.2585. Z. Shiling and G. Lin, “Simulation modeling study on short circuit ability of distribution transformer,” IOP Conf. Ser. Earth Environ. Sci., vol. 431, no. 1, 2020, doi: 10.1088/1755-1315/431/1/012037. [10] Z. El Idrissi, T. Haidi, F. Elmariami, and A. Belfqih, “Comparative study of optimization methods for optimal coordination of directional overcurrent relays with distributed generators,” IAES Int. J. Artif. Intell., vol. 12, no. 1, pp. 209–219, 2023, doi: 10.11591/ijai.v12.i1.pp209-219. [11] A. M. Shodar, “Analisis Penempatan Transformator Distribusi Berdasarkan Drop Voltage Pada PT. PLN (Persero) Distribusi Lamongan Menggunakan Software Etap 19.0,” J. Tek. Mesin, Ind. Elektro …, vol. 2, no. 4, 2023, [Online].Available:https://ejurnal.politeknikpratama.ac.id/index.php/jtmei/a rticle/view/2888%0A [12] F. P. Winarta and Y. A. Rozzi, “Load Flow Analysis and Short Circuit Faults with the Additional Distributed Generation Wind Turbine 300 kW at Andalas University,” Andalas J. Electr. Electron. Eng. Technol., vol. 1, no. 1, pp. 41–47, 2021, doi: 10.25077/ajeeet.v1i1.9. [13] F. D. Safitri, “Simulasi Penempatan Transformator Pada Jaringan Distribusi Berdasarkan Jatuh Tegangan Menggunakan Etap Power station 12.6.0,” J. Edukasi Elektro, vol. 4, no. 1, pp. 12–24, 2020, doi: 10.21831/jee.v4i1. 29315. [14] D. F. Al Fiqri, A. Situmeang, and D. Saptono, “Analisis Simulasi Pemasangan Circuit breaker Dan Short Circuit Pada Transformator Dengan Menggunakan Aplikasi Etap,” J. Ilm. Multidisiplin, vol. 2, no. 03, pp. 26 34, 2023, doi: 10.56127/jukim.v2i03.821. [15] C. Calnela, Suyitno, and I. Arif Raharjo, “Analisis Hubung Singkat Pada Gardu Induk 150/20 Kv (Studi Kasus Di Gardu Induk Gandul, Cinere),” J. Electr. Vocat. Educ. Technol., vol. 4, no. 2, pp. 53–59, 2020, doi: 10.21009/ jevet.0042.09. [16] K. Deuria, “Analisis Penggunaan Rele Diferensial Di Pltmg Sumbagut 2 Peaker Power Plant 250 Mw,” J. Energi List., vol. 10, no. 1, pp. 9–13, 2021, doi: https://doi.org/10.29103/jee.v10i1.4221. [17] A. N. A. Nisa, Marwan, and A. R. Idris, “Analisis sistem proteksi di PT. PLN (Persero) sektor pembangkitan kendari unit PLTD Wua Wua,” TEKNO, vol. 29, no. 2, pp. 177–189, 2019, [Online]. Available: http://journal2.um.ac.id/ index.php/tekno [18] I. J. Yuslan Basir, “Analisis Reposisi Rele Gangguan Tanah Terbatas Dan Stand By Gangguan Tanah Ngr Trafo Daya 30 Mva Gi Bukit Siguntang,” J. Tek. Elektro, vol. 10, no. 1, pp. 37–46, 2020, doi: https://doi.org/10.36546/ jte.v10i1.415. [19] J. Lee, M. Yoon, W. Chae, W. Kim, and S. Choi, “Strategy for optimal grid planning and system evaluation of networked distribution systems,” Sustain., vol. 14, no. 1, pp. 1–18, 2022, doi: 10.3390/su14010304. [20] M. Nafi and Syukri, “Studi Pengamanan Transformator Daya 8000 kVA Dari Gangguan Arus Lebih Pada PT PLN ( Persero ) ULPLTD Lueng Bata,” Aceh J. Electr. Eng. Technol., vol. 2, no. 1, pp. 25–29, 2022, [Online]. Available:https://ejournal.unidaaceh.ac.id/index.php/ajeetech/article/view/2 83%0A [21] F. M. Syukri, Teuku Murisal Asyadi, Muliadi, “Analisa Pembebanan Transformator Distribusi 20 kV Pada Penyulang LS5 Gardu LSA 249,” vol. 4, no. 2, pp. 202–206, 2022, doi: https://doi.org/10.37905/jjeee.v4i2.14500. [22] A. Multi and T. Addaus, “Analisa Proteksi Over Current Relay (Ocr) Dan Ground Fault Relay (Gfr) Pada Transformator Daya Gardu Induk,” Sainstech J. Penelit. Dan Pengkaj. Sains Dan Teknol., vol. 32, no. 1, pp. 1 8, 2022, doi: 10.37277/stch.v32i1.1215. [23] R. Hidayat, V. B. Kartadinata, C. Olivia Sereati, and K. Octavianus Bachri, “Penggunaan ETAP 12.6 Sebagai Alat Bantu Dalam Memilih Setting OCR Untuk Melindungi Kelangsungan dan Kestabilan Energi Listrik,” J. Elektro, vol. 15, no. 2, pp. 68–77, 2024, doi: 10.25170/jurnalelektro.v15i2.5112. [24] P. Li and P. Guo, “Characteristic Analysis of the Outer Sheath Circulating Current in a Single-Core AC Submarine Cable System,” Symmetry (Basel)., vol. 14, no. 6, pp. 1–16, 2022, doi: 10.3390/sym14061088. [25] W. F. Galla, A. S. Sampeallo, and J. I. Daris, “Analisis Gangguan Hubung Singkat Pada Saluran Udara 20 Kv Di Penyulang Naioni Pt. Pln (Persero) Ulp Kupang Untuk Menentukan Kapasitas Pemutusan Fuse Cut Out Menggunakan Etap 12.6,” J. Media Elektro, vol. IX, no. 2, pp. 101–112, 2020, doi: 10.35508/jme.v0i0.3208. [26] A. da S. Santos, L. T. Faria, M. L. M. Lopes, A. D. P. Lotufo, and C. R. Minussi, “Efficient Methodology for Detection and Classification of Short Circuit Faults in Distribution Systems with Distributed Generation,” Sensors, vol. 22, no. 23, 2022, doi: 10.3390/s22239418. [27] A. Hasibuan, M. Isa, M. I. Yusoff, and S. R. A. Rahim, “Analisa Aliran Daya Pada Sistem Tenaga Listrik Dengan Metode Fast Decoupled Menggunakan Software Etap,” RELE (Rekayasa Elektr. dan Energi) J. Tek. Elektro, vol. 3, no. 1, pp. 37–45, 2020, doi: 10.30596/rele.v3i1.5236. citation: Ardani, Bustomi (2025) Analisis Kelayakan Setting Relay OCR dan GFR Di Sistem Distribusi 20 kV Dengan Transformator 200 kVA PT Trafoindo Prima Perkasa. S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa. document_url: https://eprints.untirta.ac.id/52759/1/Bustomi%20Ardani_3332200061_Fulltext.pdf document_url: https://eprints.untirta.ac.id/52759/19/Bustomi%20Ardani_3332200061_01.pdf document_url: https://eprints.untirta.ac.id/52759/3/Bustomi%20Ardani_3332200061_02.pdf document_url: https://eprints.untirta.ac.id/52759/4/Bustomi%20Ardani_3332200061_03.pdf document_url: https://eprints.untirta.ac.id/52759/5/Bustomi%20Ardani_3332200061_04.pdf document_url: https://eprints.untirta.ac.id/52759/6/Bustomi%20Ardani_3332200061_05.pdf document_url: https://eprints.untirta.ac.id/52759/7/Bustomi%20Ardani_3332200061_Ref.pdf document_url: https://eprints.untirta.ac.id/52759/8/Bustomi%20Ardani_3332200061_Lamp.pdf document_url: https://eprints.untirta.ac.id/52759/9/Bustomi%20Ardani_3332200061_CP.pdf