eprintid: 52607 rev_number: 19 eprint_status: archive userid: 14574 dir: disk0/00/05/26/07 datestamp: 2025-07-24 02:50:50 lastmod: 2025-07-24 02:50:50 status_changed: 2025-07-24 02:50:50 type: thesis metadata_visibility: show contact_email: 3336200068@untirta.ac.id creators_name: LUTFI INDRA PRATAMA, MUHAMMAD creators_id: 3336200068 contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: ASYIAH, SITI contributors_name: FERONICA DAMANIK, MARIANA contributors_id: 198601312019032009 contributors_id: 199505202024062001 corp_creators: UNIVERSITAS SULTAN AGENG TIRTAYASA corp_creators: FAKULTAS TEKNIK corp_creators: JURUSAN TEKNIK SIPIL title: ANALISIS MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN APARTEMEN ELEVEE PENTHOUSES & RESIDENCES ispublished: pub subjects: TA subjects: TH divisions: Sipil full_text_status: restricted keywords: Risk, risk management, questionnaire, apartment abstract: Risk is uncertainty about future events over desired or undesirable outcomes (Griffin, 2002). Many abandoned building construction in Indonesia is risk management that is not met, so that it has a bad impact, namely buildings will disturb the face of the city and are no longer valuable, thus reducing the quality and identity of a city (Purwantiasning, 2017). So this study aims to analyze what risks will occur, determine the level of risk that occurs and find out how to mitigate risks in the Elevee Penthouses & Residences apartment construction project. This study aims to analyze what risks will occur, determine the level of risk that will occur and find out how to mitigate risks in the Elevee Penthouses & Residences apartment construction project. This research was carried out by a quantitative method by distributing questionnaires to project contractors through google form using the method used in this study is purposive sampling, a method for sampling according to characteristics not based on strata but based on certain considerations that are in accordance with the research objectives and the number of samples determined using the Slovin formula. From the results of data analysis that has been done during the research period, it is known that there are 31 risk indicators in the project, the most common risk in this project is cost risk which amounts to 11 indicators, then the time risk variable amounts to 10 indicators and quality amounts to 10 indicators. The results of the risk level analysis using the severity index method there are 21 indicators that are included in the high category. Risk mitigation is carried out preventively with a risk avoidance strategy of 11 actions, risk reduction 22 actions and risk transfer amounting to 1 action. date: 2025 date_type: published pages: 206 institution: Fakultas Teknik Universitas Sultan Ageng Tirtayasa department: TEKNIK SIPIL thesis_type: sarjana thesis_name: sarjana referencetext: Dimyati & Nurjaman. (2014). Manajemen Proyek. Pustaka Setia. Bandung. Durkin, J. (1994). “Expert Systems Design and Development”. New Jersey. Prentice Hall International Inc. Efendi, M. A. B., & Wibowo, R. G. (2022). Pertimbangan Biaya dalam Pemilihan Bekisting. JURNAL PILAR TEKNOLOGI Jurnal Ilmiah Ilmu Ilmu Teknik, 6(2), 69–75. https://doi.org/10.33319/piltek.v6i2.101 Elisa, P. (2013). Analisis faktor-faktor yang mempengaruhi kedisiplinan kerja karyawan pada pt. suka fajar pekanbaru. i–98. Fakar Hidayat Naypon, A., Dewita, H., Jagakarsa, T., Simatupang No, J., Barat, T., Jakarta Selatan, K., & Khusus Ibukota Jakarta, D. (2022). Analisis Risiko Terhadap Waktu Dan Biaya Pada Struktur Bawah Proyek Pembangunan Gedung Kejaksaan Tinggi Jakarta. 14(2). https://doi.org/10.30736/jt.v14i1.903 Fatimah, A., Hayati, K., & Akmal, B. (2021). Identifikasi Manajemen Risiko Proyek Konstruksi Gedung Di Provinsi Aceh. Bulletin of Civil Engineering, 1(2), 81–86. https://doi.org/10.18196/bce.v1i2.12402 Fathurohman, O. M. A. & I. D. E. (2019). Analisis Manajemen Risiko Terhadap Kinerja Proyek Rumah Susun Sederhana Sewa (Rusunawa) Jakarta Skripsi. Flanagan, R. (2012). Managing Risk for Anuncertain Future A Project Management perspective. London: School of Construction Management and Engineering The University of Reading UK Flanagan, R. dan Norman, G. (1993) Manajemen Risiko dan Konstruksi. Blackwell Scientific, Oxford. Gambut, D. I. L. (2015). Gambut, D I Lahanut. Journal of Civil Engineering, University of Tanjungpura, 15(2), 1–15. Ghozali, Imam. (2009.) Aplikasi Analisis Multivariate Dengan Progam SPSS. Edisi Keempat. Penerbit Universitas Diponegoro, Semarang. Griffin, W, Ricky dan Ronald J Ebert. (2002). Management, Erlangga, Jakarta. Puspopranoto, Sawaldjo.2006. Manajemen Bisnis.Jakarta: Penerbit PPM. HLM.99. Gulindo, H. A. (2021). Analisis Manajemen Risiko Yang Mempengaruhi Kontraktor pada Pelaksanaan Proyek Jalan dan Gedung di Kabupaten Malinau-Kalimantan Utara. Jurnal Indonesia Sosial Teknologi, 2(5), 805–815. https://doi.org/10.36418/jist.v2i5.145 Gunawan, C., Hasan, M., & Muhammad, N. (2022). Analisis Faktor Risiko Mutu Pada Pelaksanaan Proyek Jalan Batas Aceh Timur Dengan Menggunakan Metode Pca. Jurnal Arsip Rekayasa Sipil Dan Perencanaan, 5(1), 47–58. https://doi.org/10.24815/jarsp.v5i1.24600 Haidari, M. B., & Tileng, K. G. (2018). Analisis Faktor - Faktor Yang Berpengaruh pada Go-Pay. Jurnal Informatika Dan Sistem Informatika, Vol 4 No1. Hermawan, A. Y. R. (2016). Analisis Faktor-faktor Keterlambatan Proyek Jalan. Universitas Atma Jaya, Yogyakarta. Honesti, L., & Ramadhan, J. (2021). IDENTIFIKASI MANAJEMEN RISIKO KINERJA BIAYA PADA PROYEK KONTRUKSI GEDUNG DI PROVINSI SUMATRA BARAT (Dilihat dari sudut pandang kontraktor). Rang Teknik Journal, 4(1), 68–75. https://doi.org/10.31869/rtj.v4i1.2030 https://indoprecast.com/curing-beton dan-pilihan-metodenya/, 2020 https://www-consuunt- com.translate.goog/taraframework/?_x_tr_sl=en&_x_tr_tl=id&_x_tr_hl=id&__t r_pto=tc https://scaleocean.com/id/blog/belajar-bisnis/6-kegiatan-manajemen-pergudangan- terpenting-di-bisnis, 2025 Indah Melati, S. (2022). Analisis Manajemen Risiko Pada Proyek Pembangunan Jalan (Studi Kasus: Pembangunan Jalan Tarub – Denom, Jalan Bime – Weime – Nongme – Batani Kabupaten Pegunungan Bintang Oksibil). Jurnal Ekonomi Dan Bisnis, 13(2), 106–113. https://doi.org/10.55049/jeb.v13i2.188 Irawan, H. T., Pamungkas, I., Hasnita, H., & Fauza, T. S. (2024). Identifikasi dan Mitigasi Risiko pada Proyek Konstruksi Menggunakan Metode House of Risk: Studi Kasus. Jurnal Optimalisasi, 10(1), 80. https://doi.org/10.35308/jopt.v10i01.9302 Iribaram, F. W., & Huda, Mi. (2019). Analisa Resiko Biaya Dan Waktu Konstruksi Pada Proyek Pembangunan Apartemen Biz Square Rungkut Surabaya. Axial : Jurnal Rekayasa Dan Manajemen Konstruksi, 6(3), 141. https://doi.org/10.30742/axial.v6i3.542 Iswandir. (2017). Kegiatan sedang dilaksanakan Kegiatan telah dilaksanakan Feedforward Control Concurrent Control Feedback Control. Garuda, 1, 68–76. Kadek Kembang Pratiwi, N., Gusti Agung Ayu Istri Lestari, I., & Kurniari, K. (2023). Identifikasi Dan Analisis Risiko Proyek Pembangunan Gedung Pelayanan Kesehatan Ibu Dan Anak (Studi Kasus: RSUP Prof. Dr. I.G.N.G. Ngoerah Denpasar). Jurnal Ilmiah Teknik Unmas, 3(2), 82–83. Khasanah, U. (2023). Analisis risiko pada pelaksanaan proyek jalan di Kota Jayapura Provinsi Papua. Tesis, Universitas Atma Jaya Yogyakarta Kheradmand, Y. (2020). Development of a risk management model for using interpretive structural modeling. International Journal of Nonlinear Analysis and Applications, 11, 31–52. https://doi.org/10.22075/ijnaa.2020.4486 Kristiana, R., Syafi’ur, A., Muhammad, R., Sediyanto, Y., Lawa, K., Sutikno, B., Tyas, A. H., Tatan, W., Aep, S., & Afriansyah, S. (2022). Manajemen Risiko Cv. Mega Press Nusantara. www.megapress.co.id Kurnianingtias, M. (2022). Analisis Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) dengan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC) di Workshop Garmen Kampus Tekstil. Jurnal Tekstil: Jurnal Keilmuan Dan Aplikasi Bidang Tekstil Dan Manajemen Industri, 5(2), 77–87. https://doi.org/10.59432/jute.v5i2.37 Lakaoni, K. D., & Waty, M. (2023). Dampak Change Order Proyek Konstruksi Bangunan Gedung Bertingkat Sedang. JMTS: Jurnal Mitra Teknik Sipil, 6(2), 367–382. https://doi.org/10.24912/jmts.v6i2.21974 Laksmi, I. A. C. V., Jawat, I. W., & Armaeni, N. K. (2021). Faktor Pembengkakan Biaya Proyek Selama Pandemi Covid-19 Pada Kontraktor Skala Kecil di Bali. FROPIL (Forum Profesional Teknik Sipil), 9(2), 78–85. Lestari, I. G. A. A. I., Diputera, I. G. A., & Sukawibawa, G. D. G. (2022). Identifikasi Dan Mitigasi Risiko Pembangunan Infrastruktur Jalan Lingkar Badung Selatan, Badung-Bali. Ganec Swara, 16(2), 1747. https://doi.org/10.35327/gara.v16i2.341 Limantoro, C., Andi, A., & Rahardjo, J. (2023). Analisa Faktor Cost Overruns Dengan Metode Interpretive Structural Modelling Pada Beberapa Proyek Konstruksi Di Indonesia. Dimensi Utama Teknik Sipil, 10(1), 20–37. https://doi.org/10.9744/duts.10.1.20-37 Maharani, S. A., Sari, S., As’adi, M., & Saputro, A. P. (2022). Analisis Risiko Pada Proyek Konstruksi Perumahan Dengan Metode House of Risk (HOR) (Studi Kasus: Proyek Konstruksi Perumahan PT ABC). Journal of Integrated System, 5(1), 16–26. https://doi.org/10.28932/jis.v5i1.3996 Malasyi, S., Rauzana, A., & Afifuddin, M. (2021). ANALISIS FAKTOR-FAKTOR RISIKO YANG MEMPENGARUHI MUTU PADA PROYEK KONSTRUKSI DI ACEH UTARA. Teras Jurnal : Jurnal Teknik Sipil, 11(1), 223. https://doi.org/10.29103/tj.v11i1.432 Mas, F., Mursidi, B., Ode Rizki Darmawan, L., Rahman Rustan, F., & Author, K. (2023). STABILITA || Jurnal Ilmiah Teknik Sipil Analisis Manajemen Risiko Waktu Dan Biaya Pada Proyek Konstruksi Pembangunan Rsud Tipe D Kota Kendari (Vol. 11). M. Hendra Aulia Rahman, & Hanie Teki Tjendani. (2022). Identifikasi Risiko Pelaksanaan Pembangunan Proyek Gedung Highrise Building Di Hotel Grand Dafam Signature Yogyakarta. PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 11(2), 177–185. https://doi.org/10.22225/pd.11.2.5336.177-185 Maslina, Kurnia, M., Agustiyana, N., & Sari, H. M. (2022). Analisis Risiko Proyek Menggunakan Metode Sevecindex Pada Proyek Pembangunan Kantor Lingkungan Samarinda. Jurnal TRANSUKMA, 05(01), 18–26. Masombe, Rumayar, & Rondonuru. (2021). RISIKO UNTUK MEMINIMALISIR PENGARUH KETERLAMBAMasombe, N., Rumayar, A. L. E., & Rondonuwu, S. G. (2021). RISIKO UNTUK MEMINIMALISIR PENGARUH KETERLAMBATAN PROYEK KONSTRUKSI (Studi Kasus: Pembangunan Gedung Fakultas Ekonomi dan Bisnis S2/S3 Pasca Sarjana U. Jurnal Ilmiah Media Engineering, 11(1), 2087–9334. Maulana, A. W., & Santosa, B. (2020). Risk Management Analysis of Building Construction Project in the Jakarta City. Jurnal Fondasi, 9(1). https://doi.org/10.36055/jft.v9i1.7199 Miradona, W., Basrie, dan, Informasi, S., WIdya Cipta Dharma Jalan Budaya Pampang, S. R., & Budaya Pampang, K. (2021). SISTEM PAKAR DIAGNOSIS KECANDUAN GAME ONLINE DENGAN METODE FORWARD CHAINING DAN CERTAINTY FACTOR BERBASIS WEB. Muhammad Zulfikar, I Gusti Ketut Agung Ulupui, & Etty Gurendrawati. (2020). Pengaruh, Inflasi, Pertumbuhan Biaya Konstruksi, Nilai Tukar, dan Suku Bunga terhadap Gross Profit Margin (GPM). Jurnal Akuntansi, Perpajakan Dan Auditing, 1(2), 249–262. https://doi.org/10.21009/japa.0102.08 Muka, I. W. (2013). Analisis Risiko Pada Proyek Pembangunan Parkir Basement Jalan Sulawesi Denpasar. Jurnal Ilmu Dan Terapan Bidang Teknik Sipil (MKTS), 19(2), 155–165. Mutiara, N, K. (2024). Analisis Risiko Pada Pelaksanaan Proyek Pembangunan Pusat Kuliner Stasiun Street Food Bukittinggi. 4(02), 7823–7830. http://eprints.umsb.ac.id/2628/1/20180153 Ni Made Sintya Rani, & Ni Kadek Sri Ebtha Yuni. (2021). ANALISIS FAKTOR RISIKO TERHADAP KETERLAMBATAN PROYEK KONSTRUKSI THE HIMANA CONDOTEL. PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 10(1), 41–55. https://doi.org/10.22225/pd.10.1.2367.41-55 Nugraha, R. S. (2023). Analisis mitigasi risiko operasional perusahaan dengan menggunakan metode House of Risk (HOR). Tugas akhir, UNIVERSITAS ISLAM INDONESIA, YOGYAKARTA. Nurlela dan Heri Suprapto., (2014), Identifikasi Dan Analisis Manajemen Risiko Pada Proyek Pembangunan Infrastruktur Bangunan Gedung Bertingkat, Jawa Barat: Universitas Gunadarma, 112-113. Perdana Putra, I. K. B. W., Parami Dewi, A. A. D., & Sudarsana, D. K. (2021). Evaluasi Risiko Proyek Pembangunan Gedung Rsia Puri Bunda Tabanan - Bali. Jurnal Spektran, 9(2), 124. https://doi.org/10.24843/spektran.2021.v09.i02.p04 Prabowo, A.I. & Nurcahyo, C.B., (2017), ‘Analisis Risiko Rantai Pasok Beton Ready Mix Pada Proyek Hotel Batiqa Surabaya’, Jurnal Teknik ITS, 6(1). Pratiwi, N. E., Immawan, T., Handayani, D., & Fole, A. (2024). Nurham Elok Pratiwi / Perancangan Mitigasi Risiko …. Implementasi Metode ISO 31000: 2018 dalam Perancangan Mitigasi Risiko pada Proyek Depo Lokomotif Maros - Sulawesi Selatan Implementation of ISO 31000: 2018 Method in Risk Mitigation Design for the Maros Locomotive Depot Project - South Sulawesi. 136–147. Purwantiasning, A. W. (2017). Mengelola Yang Terbengkalai Menjadi Fungsional Studi Preseden: Proyek Urban Splash Di Inggris. NALARs, 16(1), 61. https://doi.org/10.24853/nalars.16.1.61-68 Putra, B. F. (2018). Analisis Faktor Penyebab Dan Mitigasi Waste Pada Proyek Konstruksi Gedung DiKota Surabaya. Tesis, 1–131. Putu Yunita Laura Vianthi, N., Bagus Mahadwijati Wijaatmaja, A., Studi Arsitektur, P., & Agung Ayu Sri Ratih Yulianasari, A. (2024). Mitigasi Risiko Pekerjaan Proyek Konstruksi Bangunan Gedung Lobby Dan Renovasi Fasad Tk Dwijendra Denpasar Desak Made Sukma Widiyani (Vol. 12, Issue 1). Raditya, A., Hardjomuljadi, S., & Amin, M. (2022). Faktor Dampak Keterlambatan Pembayaran Kontraktor Kepada Subkontraktor Pada Proyek Jalan Tol. Konstruksia, 13(1), 1. https://doi.org/10.24853/jk.13.1.1-16 Ratna, Nyoman Kutha. (2010). Metodologi Penelitian: Kajian Budaya dan Ilmu Sosial Humaniora Pada Umumnya. Pustaka Pelajar : Yogyakarta. Rauzana, A., & Usni, D. A. (2020). Kajian Faktor-Faktor Penyebab Rendahnya Kinerja Mutu pada Proyek Konstruksi di Provinsi Aceh. Media Komunikasi Teknik Sipil, 26(2), 267–274. Resmal, D. (2014). Faktor-Faktor yang Dipertimbangkan Kontraktor Dalam Memilih Subkontraktor pada Pelaksanaan Proyek Konstruksi. Skripsi. Banda Aceh: Universitas Syiah Kuala Darussalam. Risk Management: AS/NZS 4360:2004 Riswandi, M. N. M. G. Y. T. C. (2018). Faktor Penyebab Kegagalan Akibat Keterlambatan. Teknik Sipil, XV(April), 24–36. Rusda, A. R. (2024). Analisis penerapan metode lean construction pada sejumlah kontraktor di daerah Yogyakarta. Tugas akhir, Universitas Islam Indonesia, Yogyakarta. Samiono, R., Sudarjanto, A., & Raynaldi, K. (2020). Analisis Kinerja Lalu Lintas Akibat Konstruksi Pembangunan Fly Over Tanjung Barat Jakarta Selatan. Jurnal Teknik Sipil, X (1), 45–53. Santosa, A. B., & Rofiq, M. A. (2013). Pengaruh Pendapatan Asli Daerah (Pad), Dana Alokasi Umum (Dau) Dan Dana Alokasi Khusus (Dak) Terhadap Belanja Modal Pada Kabupaten / Kota (Studi Kasus Di Provinsi Jawa Barat, Jawa Tengah dan Jawa Timur Periode Tahun 2007– 2010). 20(2), 184–198. Saputra, A. G., Taran, R., Sudjarwo, P., & Buntoro, J. (2014). Identifikasi penyebab kerusakan pada beton dan pencegahannya. Dimensi Pratama Teknik Sipil, 3, 1–7. https://publication.petra.ac.id/index.php/teknik-sipil/article/view/2592/2313 Saputro, C. D. (2022). Analisis Manajemen Risiko Proyek Bangunan Gedung Bertingkat Dengan Metode Severity Index. Journal of Civil Engineering Building and Transportation, 6(2), 140–147. https://ojs.uma.ac.id/index.php/jcebt/article/view/7763 Saputro, D. H. (2021). Analisa Manajemen Risiko Pada Pelaksanaan Pembangunan Proyek Konstruksi Khususnya Bangunan Bertingkat Tinggi di Kota Semarang. 1– 16. Saputro, kardian S. (2017). Evaluasi Dan Analisa Resiko Terhadap Biaya, Waktu dan Mutu Konstruksi JLS Kabupaten Lumajang-Kabupaten Jember. 122. http://repository.its.ac.id/42818/ Sardar Fawad Saleem, Muhammad Azam Khan, M. T. (2024). Moderating role of government effectiveness and innovation in sustainable economic growth relationship in Middle East & North Africa countries. https://doi.org/https://doi.org/10.11 11/1477-8947.12397 Sasongko Nurhuda, D., Sutrisno, W., Langga, D., & Galuh, C. (2019). Analisis Risiko Keterlambatan Waktu Pada Pelaksanaan Proyek Pembangunan Spbu (Studi Kasus Di Kabupaten Bantul, Yogyakarta). Seng Hansen, S.T. M.Sc. (2017). Manajemen Kontrak Konstruksi. Penerbit PT Gramedia Pustaka Utama, Jakarta. Setyawan, A., Handayani, F. S., & Sofiana, I. (2019). Analisis Manajemen Risiko Pelaksanaan Proyek Konstruksi Thee Matic Mall dan Hotel Majalaya yang. Jurnal Konstruksi, 10(3), 188. Sholeh, M. N. (2023). Manajemen Risiko Proyek Konstruksi. Penerbit Pustaka Pranala, Yogyakarta. Simanjuntak, I. J., Siagian, R. T., Prasetyo, R., Rozak, N. F., & Purba, H. H. (2022). Manajemen Risiko Pada Proyek Konstruksi Jembatan: Kajian Literatur Sistematis. Jurnal Teknologi Dan Manajemen, 20(1), 59–76. https://doi.org/10.52330/jtm.v20i1.47 Sinaga, D. (2014). Statistik Dasar. Penerbit Uki Press, Jakarta. Situmorang, B. E. et al. (2018). Analisis Risiko Pelaksanaan Pembangunan Proyek Konstruksi Bangunan Gedung, Tekno, jurnal teknik, vol.16, hal. 31–36. Sjahli, C. M. D., & Susanto, N. (2022). Pengendalian bahaya pada divisi produksi bagian sewing PT Daiwabo Garment Indonesia dengan metode semi kuantitatif W.T. Fine. Industrial Engineering Online Journal, 11(4), 343–354. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/36042 Sugiyono. (2013). Metode Penelitian Pendidikan (Pendekatan Kuantitatif, Kualitatif dan R&D). Bandung: Alfabeta. Sumurung, G. A., Sihombing, L. B., & Simanjuntak, M. R. A. (2020). Analisis Penjaminan Mutu Terhadap Kinerja Mutu Produk Pada Proyek Bangunan Gedung X di Jakarta. Dipresentasikan pada Seminar Nasional Teknik Sipil. Teknik Sipil Fakultas Teknik Universitas Muhammadiyah Surakarta. Sunarjo, D. K., & Priyawan, P. (2022). Risk Identification in Residential Construction Project: A Systematic Literature Review. IJIEM - Indonesian Journal of Industrial Engineering and Management, 3(2), 151. https://doi.org/10.22441/ijiem.v3i2.15484 Suriyadi, S., & Azmi, F. (2022). Pengembangan Manajemen Resiko Pada Instansi Pendidikan. Warta Dharmawangsa, 16(3), 543–553. https://doi.org/10.46576/wdw.v16i3.2246 Susilowati, F., Tyagita, F. C. N., Miftahul Jannah, R., & Chrisnawati, Y. (2023). Construction Project Risk at the Toll Road Construction Implementation Phase (Case Study: Solo – Jogja Toll Road Construction Project). Media Komunikasi Teknik Sipil, 29(1), 132–140. https://doi.org/10.14710/mkts.v29i1.48840 Sutanto. (2014). Sutanto Program Studi Diploma III Teknik Sipil Fakultas Teknik , Undip. Teknik Sipil UNDIP, 15–22. SYARIF H, A., & SETYO A, R. T. J. (2022). Analisis Biaya, Mutu, Waktu Terhadap Hasil Pelaksanaan Pada Proyek Pembangunan Gedung Di Kota Semarang. 1. The Council on Tall Buildings and Urban Habitat (CTBUH). (2024). https://www.ctbuh.org/resource/height Tobing, Y. O. L., Sari, D. P., & Wicaksono, P. A. (2018). Analisis risiko proyek konstruksi dengan importance index dan bow tie analysis. Industrial Enginerring Online Journal, 7(4), 1–8. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/23004 Tyagita, F. C. N. (2022). Analisis Risiko Proyek Konstruksi Pada Tahap Pelaksanaan Pembangunan Jalan Tol (Studi Kasus: Proyek Pembangunan Jalan Tol Solo – Jogja). Wally, S. N., Jamlaay, O., & Marantika, M. (2022). Analisis Manajemen Risiko Pada Proyek Pembangunan Gedung Laboratorium Terpadu Dan Perpustakaan Man 1 Maluku Tengah. Menara: Jurnal Teknik Sipil, 17(2), 61–69. https://doi.org/10.21009/jmenara.v17i2.27124 Widodo, Slamet, Festy Ladyani, dan Rusdi. (2023). Buku Ajar Metode Penelitian. Pangkalpinang: CV Sciece Techno Direct. Yessica Purba, I., & Wulan Dari, R. (2021). Analisis Risiko Terhadap Biaya, Mutu Dan Waktu Pada Proyek Pembangunan Rumah Susun Kota Tanjung Balai Provinsi Sumatera Utara 1 Ta. 2020. Jurnal Ilmiah Teknik Sipil, 1(2). https://doi.org/10.51510/agregat.v1i2.519. Yeung. C. A., Goodfellow. A., Flanagan. L. The Truth About Sugar. Dental Update 2015; 42: 507–512. Yousri, E., Sayed, A. E. B., Farag, M. A. M., & Abdelalim, A. M. (2023). Risk Identification of Building Construction Projects in Egypt. Buildings, 13(4). https://doi.org/10.3390/buildings13041084 Yuliana, N. P. I., Suartika Putra, I. G. P. A., Yuni, N. K. S. E., & Sudiarta, I. K. (2024). Kajian Biaya Penerapan Sistem Manajemen Keselamatan Konstruksi Pada Proyek Villa Banana di Kabupaten Badung. Jurnal Talenta Sipil, 7(1), 173. https://doi.org/10.33087/talentasipil.v7i1.424 Zaidan, A. R., Soeryodarundio, K., Setiono, S., Jl, A., & Sutami, I. (2024). Analisis Manajemen Risiko Proyek dengan Metode Severity Index (SI) pada Proyek Pembangunan Gedung X Kota Surakarta Program Studi Teknik Sipil , Universitas Sebelas Maret Surakarta . Zamroni, Z., Almufid, A., Zulaecha, H. E., & Sari, R. M. (2021). Risiko Terhadap Kinerja, Biaya Dan Waktu Proyek Risks To Project Performance, Cost and Time. Jurnal Teknik, 10(1), 47–58. https://doi.org/10.31000/jt.v10i1.4027 citation: LUTFI INDRA PRATAMA, MUHAMMAD (2025) ANALISIS MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN APARTEMEN ELEVEE PENTHOUSES & RESIDENCES. S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa. document_url: https://eprints.untirta.ac.id/52607/2/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_Fulltext.pdf document_url: https://eprints.untirta.ac.id/52607/1/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_01.pdf document_url: https://eprints.untirta.ac.id/52607/3/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_02.pdf document_url: https://eprints.untirta.ac.id/52607/4/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_03.pdf document_url: https://eprints.untirta.ac.id/52607/5/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_04.pdf document_url: https://eprints.untirta.ac.id/52607/6/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_05.pdf document_url: https://eprints.untirta.ac.id/52607/7/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_06.pdf document_url: https://eprints.untirta.ac.id/52607/8/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_Ref.pdf document_url: https://eprints.untirta.ac.id/52607/9/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_Lamp.pdf document_url: https://eprints.untirta.ac.id/52607/10/Muhammad%20Lutfi%20Indra%20Pratama_3336200068_CP.pdf