eprintid: 52338 rev_number: 47 eprint_status: archive userid: 13766 dir: disk0/00/05/23/38 datestamp: 2025-07-24 03:57:20 lastmod: 2025-07-24 03:57:20 status_changed: 2025-07-24 03:57:20 type: thesis metadata_visibility: show contact_email: 3336200022@untirta.ac.id creators_name: Damayanti Safitri, Tri creators_id: 3336200022 contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_type: http://www.loc.gov/loc.terms/relators/THS contributors_name: ASYIAH, SITI contributors_name: NOVI SETIAWATI, DWI contributors_id: 198601312019032009 contributors_id: 199011052025062001 corp_creators: UNIVERSITAS SULTAN AGENG TIRTAYASA corp_creators: FAKULTAS TEKNIK corp_creators: JURUSAN TEKNIK SIPIL title: PRODUKTIVITAS TOWER CRANE PADA PROYEK PEMBANGUNAN APARTEMEN ELEVEE PENTHOUSES AND RESIDENCES ispublished: pub subjects: TA subjects: TH divisions: Sipil full_text_status: restricted keywords: Heavy Machinery, Productivities, Tower Crane, Cycle Time, Efficiency abstract: In the running of a project in the field of civil engineering, the use of heavy equipment is inevitable because heavy equipment is a factor that greatly affects the success of a project in terms of completing work on time as prescribed. In construction projects, the work time must be carried out appropriately based on the design that has been agreed upon by the owner and the implementing contractor so that there are no delays in the construction of the construction project. The objective of this study is to determine the efficiency, productivity, and operational costs of the tower crane. The research was conducted on the construction project of Elevee Penthouses and Residences. Data collection was carried out through observations of the tower crane over a period of six days. The data analysis method used is quantitative. From the results of data analysis that has been carried out during the research period, it is known that the efficiency of tower cranes in tower 1 obtained an average efficiency of 0.88. Meanwhile, the efficiency of tower cranes in tower 2 obtained an average efficiency of 0.87. For the productivity of tower cranes in tower 1, the average productivity is 1979.86 kg/hour. Meanwhile, tower 2 obtained an average productivity of 1823.47 kg/hour. So that from the productivity of the two tower cranes, a ratio of 1 : 0.92 was obtained. The operational cost of the tower crane in tower 1 is Rp. 617.546,76/hour. Meanwhile, the operational cost of the tower crane in tower 2 obtained an operational cost of Rp. 605.497,46/hour. date: 2025 date_type: published pages: 215 institution: Fakultas Teknik Universitas Sultan Ageng Tirtayasa department: TEKNIK SIPIL thesis_type: sarjana thesis_name: sarjana referencetext: Adistya Mandala, A., Octaviani, M., & Apriliani, R. A. (2023). Analisis Efektivitas Tower Crane Pada Pembangunan Proyek Gedung Universitas Airlangga. 1(October), 100–104. https://doi.org/10.25139/concrete.v1i02.7029 Alfarizi, A. F., Septiandini, E., & Wangi, I. P. (2023). Peninjauan Desain Model dan Stabilitas Pondasi Tower Crane. 7(3), 32431–32439. Amalia, S. D., & Purwadi, D. (2017). Analisis Produktivitas Tower Crane Pada Proyek Pembangunan Gedung Tunjungan Plaza 6 Surabaya. Rekayasa Teknik Sipil, 1(1), 144–155. Angkut, D. A. N. A. (2024). PENGARUH PERBAIKAN WAKTU HAMBATAN. 8(1), 53–64. Ardiansyah, A. R., Wijayaningtyas, M., & Munasih. (2023). Efektifitas Penggunaan Tower Crane dengan Metode Perbandingan pada Pembangunan Gedung Publik di Kota Malang. Student Journal Gelagar, 5(1), 71–78. https://tinyurl.com/42nxtn2r Asiyanto. 2008. Manajemen Alat Berat Untuk Konstruksi. Penerbit PT. Pradnya Paramita, Jakarta. Bonay, A. S., Indonesia, U. K., Teknik, F., Ilmu, D. A. N., & Sipil, J. T. (2011). Tinjauan jumlah tower crane yang digunakan pada gedung bertingkat. Buntarto. 2016. Alat Berat dan Sistem Undercarriage. Penerbit Pustaka Baru Press, Yogyakarta. Danel, T., Lafhaj, Z., Puppala, A., Lienard, S., & Richard, P. (2021). Proposal for tower crane productivity indicators based on data analysis in the era of construction 4.0. Buildings, 11(1), 1–15. https://doi.org/10.3390/buildings11010021 Danutirto, D. T., 2019. Perbandingan Biaya Dan Produktivitas Tower Crane Antara Tipe Potain Fo/23b Dan Xcmg Fo/23b (Studi Kasus : Proyek Pembangunan Gedung Museum Muhammadiyah Di Yogyakarta). Yogyakarta: Program Studi Teknik Sipil Fakultas Teknik Teknik Sipil Dan Perencanaan Universitas Islam Indonesia. Eric Hartono, P., & Alifen, R. S. (n.d.). PROGRAM PERHITUNGAN EFEKTIVITAS WAKTU DAN BIAYA PEMAKAIAN TOWER CRANE. Febriani, F. (2023). TUGAS AKHIR PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN PRESERVASI Studi kasus : Simpang Niam Lubuk Kambing Merlung. Guna, D., & Persyaratan, M. (2022). Eko sugiarto. Gunawan, W. Y., Wijaya, F. S., & Alifien, R. S. (2022). Efektivitas Penggunaan Tower Crane Berdasarkan Penjadwalan pada Proyek bangunan Pasar Besar Sultan Agung Kota Ngawi. Universitas Kristen Petra, 160–165. Hamdani, F., & Sucita, I. K. (2022). Optimasi Tata Letak Tower Crane pada Proyek X. MoDuluS: Media Komunikasi Dunia https://doi.org/10.32585/modulus.v4i1.1855 Ilmu Sipil, 4(1), 35. Hyun, H., Park, M., Lee, D., & Lee, J. (2021). Tower crane location optimization for heavy unit lifting in high-rise modular construction. Buildings, 11(3), 1–13. https://doi.org/10.3390/buildings11030121 Janizar, S., & Hadi Abdullah, F. (2023). Efisiensi Waktu Dan Biaya Dalam Penggunaan Alat Berat Pada Pekerjaan Pemeliharaan Overlay Ruas Tol Cipularang Jalur a. Jurnal Teknik Sipil Cendekia https://doi.org/10.51988/jtsc.v4i1.129 (Jtsc), 4(1), 451–465. Janizar, S., & Suprapto, E. R. (2021). Analisis Penempatan Dan Penentuan Jumlah Tower Crane (Tc). Jurnal Teknik Sipil Cendekia (Jtsc), 2(2), 23–34. https://doi.org/10.51988/jtsc.v2i2.35 JASMINE, K. (2014). 済無No Title No Title No Title. Penambahan Natrium Benzoat Dan Kalium Sorbat (Antiinversi) Dan Kecepatan Pengadukan Sebagai Upaya Penghambatan Reaksi Inversi Pada Nira Tebu. Journal, M., Mahardhika, S., & Nursin, A. (2022). SIKLUS PADA PROYEK Y proses pengecoran dan juga mampu maupun bahan konstruksi pada saat optimal harus memperhatikan beberapa variabel penting seperti membentuk Crane , dan selanjutnya akan didapati tersebut . Variabel di atas dibentuk. 4(2). Kajian, J., Sipil, T., Penggunaan, E., Crane, T., Bangunan, P., Bertingkat, G., Cahya, R. D., Sundara, D. M., Sipil, T., Teknik, F., Permai, S., Utara, J., Jakarta, D. K. I., Sipil, T., Teknik, F., Permai, S., Utara, J., Jakarta, D. K. I., Crane, T., … Proyek, P. (2024). Kemampuan Operator. 09(02), 62–65. Kholil. A. 2012. Alat Berat. Penerbit PT Remaja Rosdakarya Offset, Bandung. Mahardhika, S., & Nursin, A. (2022). Optimalisasi Letak Tower Crane Terhadap Waktu Siklus Pada Proyek Y. Construction and Material Journal, 4(2), 137–148. https://doi.org/10.32722/cmj.v4i2.4779 Maddeppungeng, A., Asyiah, S., Intari, D. E., Hakim, B. I., & Setiawati, D. N. (2023). Analysis of Heavy Equipment Productivity Tower Crane in The Construction Project of Sultan Maulana Hasanudin State Islamic University Building. Fondasi : Jurnal Teknik Sipil, 12(2), 174. https://doi.org/10.36055/fondasi.v12i2.21982 Maddeppungeng, A., Asyiah, S., Intari, D. E., Setiawati, D. N., Ujianto, R., & Gibran, A. (2024). Tower Crane Productivity Analysis on Apartment Development Projects. Fondasi : Jurnal Teknik https://doi.org/10.36055/fondasi.v13i1.24841 Sipil, 13(1), 101. Mahdiyah, N. N., Lidyaningtias, D., & Susapto, S. (2021). Perencanaa Penggunaan Tower Crane Untuk Pekerjaan Struktur Proyek Apartemen Bess Mansion Surabaya. Jurnal JOS-MRK, 2(3), 202–209. https://doi.org/10.55404/jos mrk.2021.02.03.202-209 Manrique, A., Saman, J., Rodriguez, S., & Melendez, K. (2020). Productivity improvement of tower crane in tall buildings. IOP Conference Series: Materials Science and 899X/758/1/012042 Engineering, 758(1). https://doi.org/10.1088/1757 MH, A. A. P. (2020). Analisis Pengoperasian Tower Crane Untuk Pekerjaan Pengecoran Struktur Kolom. Jurnal Ilmiah Desain & Konstruksi, 19(1), 75–83. https://doi.org/10.35760/dk.2020.v19i1.2698 Motyčka, V., Gašparík, J., Přibyl, O., Štěrba, M., Hořínková, D., & Kantová, R. (2022). Effective Use of Tower Cranes over Time in the Selected Construction Process. Buildings, 12(4). https://doi.org/10.3390/buildings12040436 Muis, A. R. (2007). Operator Alat Berat Wheel Loader. TeknikA, 1(28), 98–101. Peratuan Menteri PUPR No.1 Tahun 2022. Analisis Harga Satuan Pekerjaan. Bidang Pekerjaan Umum. Putra, A. E. (2020). Efisiensi Produktivitas Waktu dan Biaya Alat Berat Tower Crane. Universitas Islam Indonesia Yogyakarta, 1(3), 96. Putri, F. A. D., Rajiman, R., Winarsih, A. L. C., & Rahadianto, D. (2023). Perbandingan Efisiensi Pemakaian Tower Crane dan Mobile Crane pada Gedung Bertingkat. INSOLOGI: Jurnal Sains Dan Teknologi, 2(3), 643–656. https://doi.org/10.55123/insologi.v2i3.2284 Randan, F., Mara, J., & Tangdialla, L. T. (2021). Produktivitas Alat Berat Pengecoran Kolom pada Pembangunan Apartemen 31 Sudirman Suites Makassar. Paulus Civil Engineering Journal (PCEJ), 3(3), 303–313. http://ojs.ukipaulus.ac.id/index.php/pcej/article/view/280%0Ahttp://ojs.ukipaulu s.ac.id/index.php/pcej/article/download/280/255 Rochmanhadi. (2004). Alat-alat berat dan penggunaannya /oleh Rochmanhadi. 167 191. https://lib.ui.ac.id Rostiyanti, S.F. 2008. Alat Berat Untuk Proyek Konstruksi. Penerbit Rineka Cipta, Jakarta. Sah, A. N., & Prasetyono, P. N. (2023). Dominasi Material yang Diangkat Tower Crane pada Proyek Pembangunan Air Traffic Control Tower Bandara Internasional Kediri. Publikasi Riset Orientasi Teknik Sipil (Proteksi), 5(1), 60–66. https://doi.org/10.26740/proteksi.v5n1.p60-66 Saputra, M. (2019). Analisis Produktivitas Tower Crane Pada Proyek Pembangunan Kantor Pemerintah Kabupaten Lamongan. Rekayasa Teknik Sipil Vol., 1(1), 5–14. https://jurnalmahasiswa.unesa.ac.id/index.php/23/article/view/17692 Sinaga, F. Z., & Solikin, M. (2021). Produktivitas Alat Berat Tower Crane Untuk Pengecoran Pada Pembangunan Gedung (Studi Kasus Proyek Pembangunan Gedung XYZ di Jl. Pemuda). 624–630. Sinurat, R. T. A. (2022). Efisiensi Tata Letak Dan Penggunaan Alat Berat Tower Crane Pada Proyek Gedung Bertingkat. +Jurnal_Reskina+T.A+Sinurat_1605141033_MRKG8B_template. reskina, Sipil, T., Teknik, F., & Muhammadiyah, U. (2024). Rp1.155.214,69. 271–278 Sissatrio, M. R., Sumardi, & Riskijah, S. S. (2022). Manajemen Tower Crane Proyek Pembangunan Hotel Santika Wonosari. Jurnal JOS-MRK, 3, 220–225. Soeharto, Iman. 1999. Manajemen Proyek (Dari Konseptual Sampai Operasional). Jakarta: Erlangga. Subagyo, G. wulandari, & Tjondro, R. (2021). ANALISIS PRODUKTIVITAS TOWER CRANE (Studi Kasus Proyek Bintaro Jaya Xchange Tahap II, Tangerang Selatan). Indonesian Journal of Construction Engineering and Sustainable Development https://doi.org/10.25105/cesd.v4i2.12510 (Cesd), 4(2), 108–118. Suryawan, A. 2019. Manajemen Alat berat. Penerbit Deepublish, Yogyakarta. Syah Jaya, R., Indrayadi, M., & Pratiwi, R. (n.d.). Optimalisasi Penggunaan Alat Berat Pada Pekerjaan Peningkatan Jalan Rasau Jaya, Kubu Raya. Taufik, S. (2022). Optimalisasi Operasional Tower Crane Pada Pekerjaan Arsitektural Pelaksanaan Konstruksi Gedung Bertingkat Tinggi 168 Meter (Proyek Holland Village Jakarta). Sainstech: Jurnal Penelitian Dan Pengkajian Sains Dan Teknologi, 32(1), 56–71. https://doi.org/10.37277/stch.v32i1.1248 Utari, R. P., & Afrida, I. N. (2023). Analisis Perbandingan Efisiensi Produktivitas Tower Crane Proyek Pembangunan Apartemen Di Surabaya Barat Comparative Analysis of Tower Crane Productivity Efficiency Apartment Construction Project in West Surabaya. Hexagon, http://ejurnal.unmuhjember.ac.id/index.php/HEXAGON 08(01), 28–43. Wulandary, I. A., Rafie, R., & Pratiwi, R. (2021). Analisa Penilaian Produktivitas Peralatan Mekanis Pada Proyek Pekerjaan Jalan Ruas Pontianak – Sei. Kakap Kabupaten Kubu Raya. JeLAST : Jurnal PWK, Laut, Sipil, Tambang, 8(2), 1–11. https://jurnal.untan.ac.id/index.php/JMHMS/article/view/48677 citation: Damayanti Safitri, Tri (2025) PRODUKTIVITAS TOWER CRANE PADA PROYEK PEMBANGUNAN APARTEMEN ELEVEE PENTHOUSES AND RESIDENCES. S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa. document_url: https://eprints.untirta.ac.id/52338/1/Tri%20Damayanti%20Safitri_3336200022_Fulltext.pdf document_url: https://eprints.untirta.ac.id/52338/4/Tri%20Damayanti%20Safitri_3336200022_01.pdf document_url: https://eprints.untirta.ac.id/52338/5/Tri%20Damayanti%20Safitri_3336200022_02.pdf document_url: https://eprints.untirta.ac.id/52338/17/Tri%20Damayanti%20Safitri_3336200022_03.pdf document_url: https://eprints.untirta.ac.id/52338/13/Tri%20Damayanti%20Safitri_3336200022_04.pdf document_url: https://eprints.untirta.ac.id/52338/14/Tri%20Damayanti%20Safitri_3336200022_05.pdf document_url: https://eprints.untirta.ac.id/52338/11/Tri%20Damayanti%20Safitri_3336200022_06.pdf document_url: https://eprints.untirta.ac.id/52338/3/Tri%20Damayanti%20S._3336200022_Ref.pdf document_url: https://eprints.untirta.ac.id/52338/2/Tri%20Damayanti%20S._3336200022_Lamp.pdf document_url: https://eprints.untirta.ac.id/52338/19/Tri%20Damayanti%20Safitri_3336200022_CP.pdf