<> "The repository administrator has not yet configured an RDF license."^^ . <> . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE"^^ . "A project is a series of temporary activities that take place within a limited time\r\nwith certain resources and are designed to complete tasks with clear objectives\r\n(Nurhayati, 2010). There are several important components of project\r\nimplementation that determine project success, or what are called initial project\r\nobjectives. These components are price, time and quality which are interrelated.\r\nThese three components must be handled as well as possible in order to provide\r\nbenefits according to plan. (Husen, 2009) \r\nThe aim of this research is to determine whether project implementation is in\r\naccordance with the planned schedule, time and costs and whether the application\r\nof the Earned Value method can predict the final time and costs. Quantitative\r\nresearch will be conducted. This research uses two methods: field survey (field\r\nobservation and data collection) and analysis (result value concept). \r\nThe results of the Earned Value analysis on this project show that the Earned Value\r\nmethod is effective for estimating the time and costs used. In the 22nd week of\r\nreporting, the values obtained were CPI = 1.13 (CPI < 1) and SPI = 1.74 (SPI >\r\n1) which shows that the implementation time was completed faster than anticipated\r\nand expenditure was less than anticipated. The results of the analysis state that the\r\nprofit opportunity obtained by the contractor is IDR 811,880,865 or 11.65% with\r\nan implementation time difference of 8 weeks faster than planned."^^ . "2024-10-30" . . . . . . . . . . . . "Fakultas Teknik Universitas Sultan Ageng Tirtayasa"^^ . . . "TEKNIK SIPIL, Fakultas Teknik Universitas Sultan Ageng Tirtayasa"^^ . . . . . . . . . . . "Andi"^^ . "Maddeppungeng"^^ . "Andi Maddeppungeng"^^ . . "Rifaldi"^^ . "Anlashodik"^^ . "Rifaldi Anlashodik"^^ . . "Dwi"^^ . "Esti Intari"^^ . "Dwi Esti Intari"^^ . . "UNIVERSITAS SULTAN AGENG TIRTAYASA"^^ . . . "FAKULTAS TEKNIK"^^ . . . "JURUSAN TEKNIK SIPIL"^^ . . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Text)"^^ . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . . "ANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE (Other)"^^ . . . . . "HTML Summary of #43426 \n\nANALISIS KINERJA PROYEK PEMBANGUNAN PERUMAHAN PERMATA MUTIARA MAJA MENGGUNAKAN METODE EARNED VALUE\n\n" . "text/html" . . . "TA Engineering (General). Civil engineering (General)"@en . . . "TH Building construction"@en . .