relation: https://eprints.untirta.ac.id/42538/ title: ANALISIS BIAYA DAN WAKTU PEKERJAAN PEMASANGAN DINDING PADA KANTOR UNIT PELAKSANA TEKNIS (UPT) CREW KERETA API DEPOK creator: HENDRO, BIMO subject: TA Engineering (General). Civil engineering (General) subject: TH Building construction description: In project management, it is necessary to pay attention to project management, especially in analyzing costs and analyzing project implementation time, so that efficient and effective financing and project implementation time are achieved. This research aims to analyze the time costs of wall installation work at the Depok Railway Crew Technical Implementation Unit (UPT) Office. This research uses the critical path method (CPM) for scheduling which uses a work network diagram to describe the sequence of activities or activities required in project implementation, so that work paths can be identified which are included in the critical path or critical path. And crashing was also carried out on the project duration. In this research, the results showed that the crashing duration was originally 68 days to 64 days. There was also an increase in costs from normal costs of IDR 169,332,800.00 which increased according to the method used. The following are the cost increases obtained, including: additional labor with a total cost of IDR 178,110,200.00, additional 1 hour of work with a total cost of IDR 186,527,750.00, additional 3 hours of work with a total cost of IDR 265,065,750.00, additional labor and 1 hour of overtime work with a total cost Rp. 207,154,862.50. Keywords: Cost, Time, Crashing and CPM date: 2024-09-27 type: Thesis type: NonPeerReviewed format: text language: id identifier: https://eprints.untirta.ac.id/42538/1/Bimo%20Hendro_3336170085_Fulltext.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/2/Bimo%20Hendro_3336170085_01.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/3/Bimo%20Hendro_3336170085_02.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/4/Bimo%20Hendro_3336170085_03.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/5/Bimo%20Hendro_3336170085_04.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/6/Bimo%20Hendro_3336170085_05.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/7/Bimo%20Hendro_3336170085_06.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/8/Bimo%20Hendro_3336170085_Ref.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/9/Bimo%20Hendro_3336170085_Lamp.pdf format: text language: en identifier: https://eprints.untirta.ac.id/42538/10/Bimo%20Hendro_3336170085_CP.pdf identifier: HENDRO, BIMO (2024) ANALISIS BIAYA DAN WAKTU PEKERJAAN PEMASANGAN DINDING PADA KANTOR UNIT PELAKSANA TEKNIS (UPT) CREW KERETA API DEPOK. S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa.