Febrianingsih, Tri Suci and Ummi, Nurul and Febianti, Evi (2016) PENGENDALIAN WAKTU DAN BIAYA PELAKSANAAN PROYEK PEMBANGUNAN TRANSMISI PIPA GAS MENGGUNAKAN CRITICAL PATH METHOD. S1 thesis, UNIVERSITAS SULTAN AGENG TIRTAYASA.
Text (SKRIPSI)
PENGENDALIAN WAKTU DAN BIAYA PELAKSANAAN.pdf - Published Version Restricted to Registered users only Download (7MB) |
Abstract
PT. ABC is a company in the field of pipeline construction projects. Project undertaken by PT. ABC one of which is the construction of a 3.65 km gas transmission pipeline in Karawang, namely PT. XYZ is the object of research. The project experienced problems the inappropriateness of the time in the implementation of projects that exceed a project plan that is 172 days. In the actual condition of the project implementation has been delayed 28 days, so the actual time the project to 200 days with a maintenance period of 90 days. The time delay in the project resulted in the penalty, then do penegndalian time and cost of implementation of development projects of gas pipeline transmission using CPM (Critical Path Method). The results of this study, the control of time and cost of the project with a crash program of activities critical path CPM calculation results which resulted in eight alternative proposals control the time and cost of the project. Of the eight proposals alterntif get results better alternative proposal is an alternative proposal by crashing activities L, H, B, J, D, G, and F with a duration of 155 days, and the total project cost Rp 3.986.064.697,00, as well as gains Rp 1.013.935.303,00 obtained. Results better scheduling proposals expected future could be a proposal for an upcoming project. Keywords : Crash Program, Crtical Path Method (CPM), Project Control
Item Type: | Thesis (S1) | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
|||||||||
Uncontrolled Keywords: | Crash Program, Crtical Path Method (CPM), Project Control | |||||||||
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management | |||||||||
Divisions: | 03-Fakultas Teknik > 26201-Jurusan Teknik Industri | |||||||||
Depositing User: | Perpustakaan Pusat | |||||||||
Date Deposited: | 16 Dec 2021 10:09 | |||||||||
Last Modified: | 16 Dec 2021 10:09 | |||||||||
URI: | http://eprints.untirta.ac.id/id/eprint/9649 |
Actions (login required)
View Item |