Muhammad Abduh, Nur (2013) ANALISA EFISIENSI KONVERSI ENERGI PADA PROSES PEMBUATAN BESI SPONS DI REAKTOR 1 HYL III. S1 thesis, Fakultas teknik universitas sultan ageng tirtayasa.
|
Text (fulltext)
Skripsi Mesin_compressed.pdf Restricted to Registered users only Download (8MB) |
Abstract
Penelitian ini bertujuan untuk menganalisa efisiensi konversi energi pada proses pembuatan besi spons di reaktor 1 HYL III. Metode yang digunakan adalah metode langsung, yaitu perhitungan efisiensi jumlah energi yang diserap dibagi dengan jumlah energi yang masuk. Energi yang diserap antara lain kalor yang diserap pellet, sedangkan energi yang masuk antara lain kalor yang diserap gas reformer dalam heater, energi bahan bakar pada heater 404-B1, daya pompa 402-J1, J2, daya pompa 458-J1 dan daya kompresor 471-J1. Data yang diperlukan yaitu komposisi gas alam, gas proses, material bijih pellet, serta data operasi pompa dan kompresor. Sedangkan langkah-langkah yang dilakukan adalah menghitung kalor yang diserap pellet, kalor yang diserap gas reformer dalam heater, daya pompa, daya kompresor dan yang terakhir menghitung nilai efisiensi konversi energi pada proses pembuatan besi spons direaktor 1. Dari hasil penelitian yang telah dilakukan pada tanggal 2 April 2013 didapatkan nilai efisiensi reaktor yang tertinggi sebesar 43,55% dengan aliran massa pellet sebesar 48,056 kg/s, semakin rendah produksi spons maka nilai efisiensi reaktor semakin rendah.
| Item Type: | Thesis (S1) | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
|||||||||
| Additional Information: | This study aims to analyze the efficiency of energy conversion in the proses of making sponge iron in reactor 1 HYL III. Method which used is the direct method, the calculation of the amount of energy absorbed efficiency divided by the number of input energy. Among other energy absorbed heat is absorbed pellet, while the input energy among other, the heat absorbed by the reformer gas, fuel energy to heater 404-B1, pump power 402-JI,J2, pump power 458-J1, compressor power. Required data is composition of natural gas, gas process, material iron ore pellet and then operation data pump and compressor. While the steps taken to calculate the heat absorbed pellet, heat absorbed by the reformer gas in heater, pump power, compressor power and finally calculate the value efficiency of energy conversion in the process of making sponge iron in reactor 1. Of the research that has been conducted on 2 April 2013 obtained the highest value of the reactor efficiency by 43,55% with masses flow of pellet by 48,056 kg/s, the lower production of sponge than the value ofthe lower reactor efficiency. | |||||||||
| Uncontrolled Keywords: | Efisiensi, Energi, Besi spons | |||||||||
| Subjects: | T Technology > TJ Mechanical engineering and machinery | |||||||||
| Divisions: | 03-Fakultas Teknik > 21201-Jurusan Teknik Mesin | |||||||||
| Depositing User: | SISWA MAGANG FT | |||||||||
| Date Deposited: | 18 Sep 2025 03:02 | |||||||||
| Last Modified: | 18 Sep 2025 03:02 | |||||||||
| URI: | http://eprints.untirta.ac.id/id/eprint/54758 |
Actions (login required)
![]() |
View Item |
