LOAD FLOW ANALYSIS PENGGUNAAN BUS COUPLER PADA SISTEM AUXILIARY UNIT 1 DAN UNIT 2 PT. INDONESIA POWER UBP SURALAYA

ILHAM RIZKI, FEBRIYAN (2025) LOAD FLOW ANALYSIS PENGGUNAAN BUS COUPLER PADA SISTEM AUXILIARY UNIT 1 DAN UNIT 2 PT. INDONESIA POWER UBP SURALAYA. S1 thesis, Fakultas Teknik Universitas Sultan Ageng TIrtayasa.

[img] Text (Fulltext)
Ilham Rizki Febriyan_3332210025_Fulltext.pdf - Published Version
Restricted to Registered users only

Download (2MB)
[img] Text (Bab 1)
Ilham Rizki Febriyan_3332210025_01.pdf - Published Version
Restricted to Registered users only

Download (2MB)
[img] Text (Bab 2)
Ilham Rizki Febriyan_3332210025_02.pdf - Published Version
Restricted to Registered users only

Download (1MB)
[img] Text (Bab 3)
Ilham Rizki Febriyan_3332210025_03.pdf - Published Version
Restricted to Registered users only

Download (1MB)
[img] Text (Bab 4)
Ilham Rizki Febriyan_3332210025_04.pdf - Published Version
Restricted to Registered users only

Download (593kB)
[img] Text (Bab 5)
Ilham Rizki Febriyan_3332210025_05.pdf - Published Version
Restricted to Registered users only

Download (412kB)
[img] Text (Daftar Referensi)
Ilham Rizki Febriyan_3332210025_Ref.pdf - Published Version
Restricted to Registered users only

Download (385kB)
[img] Text (Lampiran)
Ilham Rizki Febriyan_3332210025_Lamp.pdf - Published Version
Restricted to Registered users only

Download (2MB)
[img] Text (Cek Plagiasi)
Ilham Rizki Febriyan_3332210025_CP.pdf - Published Version
Restricted to Registered users only

Download (16MB)

Abstract

Electrical energy is one energy that cannot be separated from human life today, hence it is important to have good quality electricity supply starting from its generation. The auxiliary system is a system in a power plant that functions to generate electricity, part of the electricity generated is not sold, but is used by the plant itself for generating electricity, in contrast to consumer loads that are sent to the transmission line. The auxiliary system is susceptible to disturbances that can hinder the electricity production process, ETAP or Electrical Transient Analyzer is a software that able to do load flow analysis, load flow analysis is a procedure used in the power system model under certain conditions to calculate important parameters to analyze the operation of a system. The auxiliary system of unit 1 UBP Suralaya consists of several equipment such as a 400MW generator that functions to provide a source to the system, two transformers, namely the Unit Service Transformer that functions to reduce the voltage nominal from the generator to the load busbar, the Station Service Transformer that functions to provide the initial source. One endeavor to increase the reliability of the electric power system is to apply a bus coupler that connects to another generation unit. This study concluded that the auxiliary system of unit 1 UBP Suralaya experienced disruption in its operation, namely overload on the transformer used, UST or SST, therefore that it is necessary to do uprating or increase specifications. And the use of bus coupler is considered impossible before the transformer and circuit breaker are uprated. Keywords: Bus Coupler, Load Flow Analysis, Overload, PLTU, Transformator

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
Thesis advisorMuhamad, Otong197203192005011001
Thesis advisorAdi, Nugraha199507082022031009
Subjects: Q Science > Q Science (General)
T Technology > T Technology (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: 03-Fakultas Teknik > 20201-Jurusan Teknik Elektro
Depositing User: Tn Ilham Rizki Febriyan
Date Deposited: 14 Jul 2025 03:03
Last Modified: 14 Jul 2025 03:03
URI: http://eprints.untirta.ac.id/id/eprint/51356

Actions (login required)

View Item View Item