OPTIMALISASI PENGGUNAAN ALAT BERAT PADA PROYEK BASEMENT MASJID AGUNG KOTA SERANG

Maretha, Jordan (2024) OPTIMALISASI PENGGUNAAN ALAT BERAT PADA PROYEK BASEMENT MASJID AGUNG KOTA SERANG. S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa.

[img] Text (Skripsi)
Jordan Maretha_3336200035_Fulltext.pdf
Restricted to Registered users only

Download (33MB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_01.pdf
Restricted to Registered users only

Download (924kB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_02.pdf
Restricted to Registered users only

Download (300kB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_03.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_04.pdf
Restricted to Registered users only

Download (106kB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_05.pdf
Restricted to Registered users only

Download (550kB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_06.pdf
Restricted to Registered users only

Download (31kB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_Ref.pdf
Restricted to Registered users only

Download (73kB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_Lamp.pdf
Restricted to Registered users only

Download (30MB)
[img] Text (Skripsi)
Jordan Maretha_3336200035_CP.pdf
Restricted to Registered users only

Download (38MB)

Abstract

Urbanization and the increase in population continue to increase as the years pass in Serang City. As a result of the increase in population, development activities in the construction sector run linearly with the increase in the population of Serang City. Therefore, construction activities are increasingly busy, of course requiring heavy equipment on the project.This research discusses the costs and time of using heavy equipment by calculating the productivity and costs of heavy equipment that supports a project in terms of time and cost efficiency with the aim of finding out the most optimal costs, times and alternatives so that you can find out the most optimal costs, times and combinations. using data analysis methods.The tools used in the basement construction project of the Great Mosque in Serang City are breaker excavators, excavators and dump trucks with working hours of 8 hours a day. The results of this research are that the cost and productivity of using an excavator breaker is IDR. 3,201,008.00 with a production rate of 17.42 m3/hour or 139.36 m3/day, then the excavator has a production of 69.54 m3/hour or 556.32 m3/day with a rental fee of Rp. 3,201,008.00 and the last one is a dump truck with a production of 6.74 m3 / hour or 53.92 m3 / day with a rental fee of 2,502,000.00 / day.

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
Thesis advisorAsyiah, Siti198601312019032009
UNSPECIFIEDIntari, Esti198601242014042001
Additional Information: Urbanisasi dan kenaikan jumlah penduduk terus bertambah seiring bergantinya tahun di Kota Serang Akibat daripada peningkatan jumlah penduduk tersebut maka kegiatan pembangunan disektor konstruksi berjalan linear dengan peningkatan jumlah penduduk Kota Serang. Maka dari itu kegiatan konstruksi semakin sibuk tentu memerlukan alat berat pada proyek. Penelitian ini membahas tentang biaya dan waktu dari penggunaan alat berat dengan perhitungan produktivitas dan biaya alat berat yang mendukung suatu proyek dalam efisiensi waktu dan biaya yang berutujuan untuk mengetahui biaya, waktu dan alternatif paling optimal sehingga dapat mengetahui biaya, waktu, dan kombinasi yang paling optimal menggunakan metode analisis data. Alat yang digunakan pada proyek pembangunan basement Masjid Agung Kota serang yakni breaker excavator, excavator dan dump truck dengan jam kerja sehari sebesar 8 jam. Hasil dari penelitian ini yaitu biaya dan produktivitas penggunaan dari breaker excavator adalah sebesar Rp. 3.201.008.00 dengan besaran produksi 17,42 m3/jam atau 139,36 m3/ hari selanjutnya excavator mempunyai produksi sebesar 69,54 m3/ jam atau 556,32 m3/ hari dengan biaya sewa sebesar Rp. 3.201.008.00 dan yang terakhir yakni dump truck dengan produksi 6,74 m3/jam atau 53,92 m3/ hari dengan biaya sewa yaitu 2.502.000.00 / hari.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: 03-Fakultas Teknik
03-Fakultas Teknik > 22201-Jurusan Teknik Sipil
Depositing User: Mr Jordan Maretha
Date Deposited: 14 Nov 2024 15:51
Last Modified: 24 Dec 2024 10:02
URI: http://eprints.untirta.ac.id/id/eprint/43835