FERONIKA, WAHYU (2019) PENGARUH CONTRACT CHANGE ORDER TERHADAP TERJADINYA KLAIM SEBAGAI PENYEBAB SENGKETA PADA PROYEK KONSTRUKSI (Studi Kasus High Rise Building di DKI Jakarta dan Tangerang). S1 thesis, UNIVERSITAS SULTAN AGENG TIRTAYASA.
Text
PENGARUH CONTRACT CHANGE ORDER TERHADAP TERJADINYA KLAIM SEBAGAI PENYEBAB SENGKETA PADA PROYEK KONSTRUKSI.pdf Restricted to Registered users only Download (22MB) |
Abstract
Contract change orders in construction projects result in modifications to the scope of work, execution time, or costs. This allows loss to occur so that claims are filed. If the claim has been approved but the claim is not served properly, there will be a dispute. The purpose of this study is to determine the effect of Contract change order on Claim and Dispute of Construction Project , so that Contract change order can be minimized. The study method uses Stuctural Equation Modeling (SEM) and software LISREL ver.8.8 software to process the data. The results of this study indicate that the effect of Contract change order on Claim is 91% and the effect of Contract change order on Dispute is 51%. While the effect Contract change order on Dispute through on Claim are 46%. Keywords : Contract Change Order, Claim , Dispute
Item Type: | Thesis (S1) | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
|||||||||
Subjects: | T Technology > T Technology (General) | |||||||||
Divisions: | 03-Fakultas Teknik 03-Fakultas Teknik > 22201-Jurusan Teknik Sipil |
|||||||||
Depositing User: | Admin Eprints Untirta | |||||||||
Date Deposited: | 27 Oct 2021 04:53 | |||||||||
Last Modified: | 27 Oct 2021 04:53 | |||||||||
URI: | http://eprints.untirta.ac.id/id/eprint/3860 |
Actions (login required)
View Item |