Search for collections on EPrints Repository UNTIRTA

Usulan Penjadwalan Produksi Dengan Metode Nawaz Enscore Ham dan Linear Programming Untuk Meminimasi Makespan (Studi Kasus : CV Macuy Sejahtera Abadi)

Lazuardi, Hilal (2023) Usulan Penjadwalan Produksi Dengan Metode Nawaz Enscore Ham dan Linear Programming Untuk Meminimasi Makespan (Studi Kasus : CV Macuy Sejahtera Abadi). S1 thesis, Fakultas Teknik Universitas Sultan Ageng Tirtayasa.

[img] Text (Skripsi)
Hilal Lazuardi_333190073_Fulltext.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (Skripsi)
Hilal Lazuardi_3333190073_01.pdf
Restricted to Registered users only

Download (640kB)
[img] Text (Skripsi)
Hilal Lazuardi_3333190073_02.pdf
Restricted to Registered users only

Download (195kB)
[img] Text (Skripsi)
Hilal Lazuardi_3333190073_03.pdf
Restricted to Registered users only

Download (117kB)
[img] Text (Skripsi)
Hilal Lazuardi_3333190073_04.pdf
Restricted to Registered users only

Download (712kB)
[img] Text (Skripsi)
Hilal Lazuardi_3333190073_05.pdf
Restricted to Registered users only

Download (32kB)
[img] Text
Hilal Lazuardi_3333190073_06.pdf

Download (16kB)
[img] Text (Skripsi)
Hilal Lazuardi_3333190073_Ref.pdf
Restricted to Registered users only

Download (21kB)
[img] Text (Skripsi)
Hilal Lazuardi_3333190073_Lamp.pdf
Restricted to Registered users only

Download (661kB)
[img] Text (Skripsi)
Hilal Lazuardi_3333190073_CP.pdf
Restricted to Registered users only

Download (12MB)

Abstract

Scheduling is a core technique in the production system in managing the allocation of resources so that the production system can run quickly and precisely so that optimal results are obtained. CV Macuy Sejahtera Abadi or referred to as CV MSA is a company engaged in manufacturing, especially in the production of wooden pallets and wood haspel. CV MSA serves the demand for pallets and wood chips for the domestic market with a flow shop type production flow that uses the First Come First Served (FCFS) scheduling method in its production scheduling. In December 2022 the demand that came was reduced so that the available production capacity was not used optimally, while in January 2023 the demand that came back to normal even increased so that the capacity owned by CV MSA was not enough to meet the incoming demand. This is due to the occurrence of quite a lot of idle time during the transition to the next job. This fluctuation in demand makes the production capacity on the CV MSA unable to be used optimally. The purpose of this study was to provide a production scheduling proposal to minimize makespan. This study used two flow shop scheduling methods, namely the Nawaz Enscore Ham (NEH) method and the linear programming method. The results showed that the existing condition by scheduling the FCFS method in December 2022 was 106,678 hours. As for January 2022, it is 271,798 hours, and there is a delay. The makespan value for scheduling with the December 2022 Nawaz Enscore Ham method is 185,500 hours. As for January 2023, it is 232,392 hours, and there is no delay. The makespan value for scheduling with the linear programming method in December 2022 is 185,501 hours. As for January 2023, it is 232,391 hours, and there is no delay. So it can be concluded that scheduling with the NEH method and the linear programming method in this study provides the best makespan.

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
UNSPECIFIEDMuharni, Yusraini197409082003122001
UNSPECIFIEDMutaqin, Ade Irman Saeful19820615201221002
Additional Information: Penjadwalan merupakan teknik inti dalam sistem produksi dalam mengatur pengalokasian sumber daya agar sistem produksi dapat berjalan dengan cepat dan tepat sehingga didapatkan hasil yang optimal. CV Macuy Sejahtera Abadi atau disebut dengan CV MSA merupakan perusahaan yang bergerak dibidang manufaktur khususnya pada produksi palet kayu dan haspel kayu. CV MSA melayani permintaan palet dan haspel kayu untuk pasar domestik dengan aliran produksi berjenis flow shop yang menggunakan metode penjadwalan First Come First Served (FCFS) pada penjadwalan produksinya. Pada Bulan Desember 2022 permintaan yang datang berkurang sehingga kapasitas produksi yang tersedia tidak digunakan secara maksimal, sedangkan pada Bulan Januari 2023 permintaan yang datang kembali normal bahkan meningkat sehingga kapasitas yang dimiliki oleh CV MSA tidak cukup untuk memenuhi permintaan yang datang. Hal ini dikarenakan terjadinya idle time yang cukup banyak saat transisi ke job berikutnya. Fluktuasi permintaan ini membuat kapasitas produksi pada CV MSA tidak bisa digunakan secara optimal. Tujuan penelitian ini adalah untuk memberikan usulan penjadwalan produksi untuk meminimasi makespan. Penelitian ini menggunakan dua metode penjadwalan flow shop yaitu metode Nawaz Enscore Ham (NEH) dan metode linear programming. Hasil penelitian menunjukan pada kondisi eksisting yaitu dengan penjadwalan metode FCFS pada Bulan Desember 2022 adalah 106,678 jam. Sedangkan untuk Januari 2022 adalah 271,798 jam, dan terjadi keterlambatan. Nilai makespan untuk penjadwalan dengan metode Nawaz Enscore Ham Bulan Desember 2022 adalah 185,500 jam. Sedangkan untuk Januari 2023 adalah 232,392 jam, dan tidak terjadi keterlambatan. Nilai makespan untuk penjadwalan dengan metode linear programming Bulan Desember 2022 adalah 185,501 jam. Sedangkan untuk Januari 2023 adalah 232,391 jam, dan tidak terjadi keterlambatan. Maka dapat disimpulkan bahwa penjadwalan dengan metode NEH dan metode linear programming pada penelitian ini memberikan makespan terbaik.
Subjects: T Technology > TS Manufactures
Divisions: 03-Fakultas Teknik > 26201-Jurusan Teknik Industri
Depositing User: Mr Hilal Lazuardi
Date Deposited: 11 Apr 2023 09:39
Last Modified: 11 Apr 2023 10:25
URI: http://eprints.untirta.ac.id/id/eprint/23246

Actions (login required)

View Item View Item