Search for collections on EPrints Repository UNTIRTA

ANALISIS STABILITAS TRANSIENT DAN PERANCANGAN PELEPASAN BEBAN PADA SISTEM KELISTRIKAN PT. KRAKATAU DAYA LISTRIK

BAGUS PRASETIO, M (2022) ANALISIS STABILITAS TRANSIENT DAN PERANCANGAN PELEPASAN BEBAN PADA SISTEM KELISTRIKAN PT. KRAKATAU DAYA LISTRIK. S1 thesis, UNIVERSITAS SULTAN AGENG TIRTAYASA.

[img] Text
COVER.pdf
Restricted to Registered users only

Download (10MB)
[img] Text
BAB 1.pdf
Restricted to Registered users only

Download (570kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (826kB)
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (743kB)
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (4MB)
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (553kB)
[img] Text
DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (499kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (3MB)

Abstract

PT. Krakatau Daya Listrik merupakan perusahaan pembangkit listrik yang berlokasi di Cilegon. PT. Krakatau Daya Listrik saat ini memiliki dua Pembangkit Listrik Tenaga Gas (PLTG) yang masing masing berkapasitas 38 MW dan satu unit Pembangkit Listrik Tenaga Gas Uap (PLTGU) yang berkapasitas 40 MW, serta terhubung dengan interkoneksi PLN untuk melayani bebannya. Apabila terjadi gangguan pada generator sehingga menyebabkan generator terlepas, tentunya akan menyebabkan generator yang masih bekerja akan menanggung beban lebih besar dari kapasitasnya, yang berakibat menurunnya frekuensi sistem, jika di biarkan dalam jangka waktu tertentu akan menyebabkan generator yang masih beroperasi akan terlepas juga dari sistem. Oleh karena itu sistem kelistrikan ini dituntut harus tetap stabil dan kontinu dalam menyuplai energi listrik ke konsumen. Maka diperlukan analisis stabilitas transient untuk mengetahui kestabilan frekuensi sistem apabila terjadi gangguan. Gangguan yang digunakan adalah beberapa skenario kombinasi generator lepas. Hasil perhitungan menunjukkan saat generator GTG1 lepas menyebabkan frekuensi turun hingga 48,8 Hz, dan diperlukan pelepasan beban sebesar 40,24 MW untuk meningkatkan frekuensi kembali ke rentang yang di izinkan. Sedangkan untuk kasus PLN lepas menyebabkan frekuensi turun hingga 48,342 Hz, dan diperlukan pelepasan beban sebesar 75,095 MW untuk meningkatkan frekuensi kembali kerentang yang di izinkan. Skenario pelepasan beban di atas akan di simulasikan dengan software ETAP 16.0.0, yang skema pelepasannya menggunakan Under Frequency Relay

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
Thesis advisorHERUDIN, HERUDINUNSPECIFIED
Thesis advisorMARTININGSIH, WAHYUNIUNSPECIFIED
Additional Information: PT. Krakatau Daya Listrik is a power plant company located in Cilegon. PT. Krakatau Daya Listrik currently has two Gas Power Plants (PLTG) each with a capacity of 38 MW and one unit of Steam Gas Power Plant (PLTGU) with a capacity of 40 MW, and connected to the PLN interconnection to serve the load. If there is a disturbance in the generator that causes the generator to be released, of course it will cause the generator that is still working to bear a load greater than its capacity, which results in a decrease in system frequency, which if left for a certain period of time will cause the generator that is still operating to be detached from the system. Therefore, this electricity system is required to remain stable and continuous in supplying electrical energy to consumers. So transient stability analysis is needed to determine the stability of the system frequency in the event of a disturbance. The disturbances used are several scenarios of loose generator combinations. The calculation results show that when the GTG1 generator is disconnected, the frequency drops to 48.8 Hz, and a load shedding of 40.24 MW is required to raise the frequency back to the permitted range. Meanwhile, in the case of PLN off, the frequency drops to 48.342 Hz, and a load shedding of 75.095 MW is required to increase the frequency back in the permitted range. The load shedding scenario above will be simulated with the ETAP 16.0.0 software, whose discharge scheme uses Under Frequency Relay. Keywords : Transient Stability, Load Shedding, ETAP 16.0.0, Under Frequency Relay
Uncontrolled Keywords: Kata Kunci : Kestabilan Transien, Pelepasan Beban, ETAP 16.0.0, Under Frequency Relay
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: 03-Fakultas Teknik
03-Fakultas Teknik > 20201-Jurusan Teknik Elektro
Depositing User: Perpustakaan Pusat
Date Deposited: 22 Jul 2022 14:11
Last Modified: 22 Jul 2022 14:11
URI: http://eprints.untirta.ac.id/id/eprint/14708

Actions (login required)

View Item View Item