Search for collections on EPrints Repository UNTIRTA

STUDI POTENSI PEMBANGKIT LISTRIK TENAGA SURYA SEBAGAI ENERGI PENDUKUNG PADA SISTEM KELISTRIKAN DI HOTEL THE ROYALE KRAKATAU CILEGON

PERMANA, HASNO (2014) STUDI POTENSI PEMBANGKIT LISTRIK TENAGA SURYA SEBAGAI ENERGI PENDUKUNG PADA SISTEM KELISTRIKAN DI HOTEL THE ROYALE KRAKATAU CILEGON. S1 thesis, UNIVERSITAS SULTAN AGENG TIRTAYASA.

[img] Text
STUDI POTENSI PEMBANGKIT LISTRIK TENAGA SURYA SEBAGAI ENERGI.PDF - Published Version
Restricted to Registered users only

Download (6MB)

Abstract

Sumber energi untuk pembangkit listrik yang berasal dari fosil semakin menipis membuat manusia harus mencari sumber energi alternatif seperti sumber energi alternatif tenaga surya. Potensi pengembangan PLTS di Indonesia sangat menjanjikan dilihat dari letak geografis Indonesia yang berada pada garis khatulistiwa. Berdasarkan peta insolasi matahari, Kota Cilegon memiliki potensi radiasi matahari sebesar 4,61kW/m2 /hari (BMKG,2011). Pemanfaatan energi matahari secara optimal diharapkan dapat menjadi salah satu energi alternatif untuk menggantikan pembangkit listrik konversional (minyak dan batubara). Besarnya potensi ini dapat dimanfaatkan pada skema PLTS (Pembangkit Listrik Tenaga Surya) sebagai pembangkit listrik tambahan untuk meningkatkan produksi listrik untuk kebutuhan hotel. Sistem PLTS yang dirancang mampu menghasilkan pembangkitan panel surya sebesar 25,5 kW dengan suplai berdasarkan hasil studi potensi radiasi matahari sepanjang tahun 2009 sampai 2012 sebesar 106,189 Mw dengan tingkat kenadalan sebesar 0,883. Aspek biaya PLTS sebesar $0,579/kWh dan waktu pengembalian investasi selama 15 tahun

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
Thesis advisorSuhendar, Suhendar197505102008121005
Thesis advisorAlimuddin, Alimuddin197204172008121004
Additional Information: Source of energy for power plant derived from fossil depleting make human need to find of alternative energi sources as of alternative energy source solar. Potential for development PLTS in indonesia very promising seen from geography indonesia that is at its equator. Based on a map insolation the sun. Cilegon city has the potential solar radiation of 4,61 kw/m2 days (BMKG,2011) utiization of solar energy optimally expected to be one alternative energy to replace power plants konventional ( oil and coal ). The abundant potential of this utilization scheme PLTS as power plant additional for increasing production of electricity to the hotel. System PLTS designed capable of producing generation of solar panel of 25,5 kw with supply based on potential solar radiation all year 2009 - 2011 of 106,189 Mw with the level of reliability of 0,883. Aspect of the cost of PLTS $0,579/kwh and time the return on investment for 15 year
Uncontrolled Keywords: Kata Kunci- Energi Alternatif, PLTS, Biaya Investasi
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: 03-Fakultas Teknik
03-Fakultas Teknik > 20201-Jurusan Teknik Elektro
Depositing User: Perpustakaan Pusat
Date Deposited: 21 Apr 2022 15:06
Last Modified: 25 Aug 2022 09:42
URI: http://eprints.untirta.ac.id/id/eprint/12893

Actions (login required)

View Item View Item