STUDI INSTALASI LISTRIK PADA GEDUNG FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA CILEGON BANTEN

MUSTAKIM, SIROTOL (2014) STUDI INSTALASI LISTRIK PADA GEDUNG FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA CILEGON BANTEN. S1 thesis, UNIVERSITAS SULTAN AGENG TIRTAYASA.

[img] Text
STUDI INSTALASI LISTRIK PADA GEDUNG FAKULTAS TEKNIK UNIVERSITAS SULTAN AGENG TIRTAYASA CILEGON BANTEN.pdf - Published Version
Restricted to Registered users only

Download (3MB)

Abstract

Gedung FT. UNTIRTA merupakan suatu bangunan yang di dalamnya terdapat banyak peralatan yang memakai instalasi listrik baik satu fasa maupun dengan tiga fasa, perlu adanya gambar instalasi untuk landasan perbaikan dan pengembangan instalasi gedung-gedung baru, Gedung Fakultas Teknik Universitas Sultan Ageng Tirtayasa memiliki 2 Main Distribution Panel (MDP) 1 Panel Hubung Bagi (PHB) 1 Junction Box (JB) dan 35 Sub Distribution Panel (SDP) yang disuplai dari PT. Krakatau Daya Listrik (KDL). Dari hasil pendataan total beban yang terpasang di FT. UNTIRTA untuk MDP A sebesar 135.662Watt dan MDP B sebesar 212.663Watt, sehingga total beban maksimum yang terpasang sebesar 348.325Watt. Simulasi sofware etap 7.0.0 dengan menggunakan analisis Unbalanced Load Flow (ULF) pada beban maksimum mengalami ketidak seimbangan beban dengan phase R 89,5%, phase S 108,6% dan phase T 101,9%. Setelah melakukan penyeimbangan pada setiap phasenya adalah, phase R 99,7%, phase S 100,3%, dan phase T 100%, kondisi MDP B Phase R 99,4%, phase S 100,3%, dan phase T 100,3%

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
Thesis advisorHaryanto, Heri197611292003121003
Thesis advisorMARIANINGSIH, Wahyuni196303132001122001
Additional Information: Building FT.Untirta is a building on it there is a lot of equipment who wears electrical installations either one phase and with three phase, need of pictures installation to the repair and development installation new buildings building of Engineering Faculty University Sultan Ageng Tirtayasa have 2 Main Distribution Panels (MDP) 1 panel hyphen for (PHB) 1 junction box (JB) and 35 sub-division distribution panels (SDP) supplied by from PT.Krakatau Daya Listrik (KDL). From the survey total burden those at the FT.Untirta to MDP A of 135.662Watt and MDP B of 212.663Watt, making total burden maximum attached of 348.325Watt. Simulation sofware etap 7.0.0 by using analysis unbalanced load flow (ULF) on burden maximum experiencing the unbalanced load with phase R 89,5%, phase S 108,6% and phase T 101,9%. After doing balancing of on each phasenya is, phase R 99.7%, phase S 100,3%, and phase T 100%
Uncontrolled Keywords: Kata kunci: Ketidak setimbangan Beban, ETAP 7.0.0, Gambar instalasi
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: 03-Fakultas Teknik
03-Fakultas Teknik > 20201-Jurusan Teknik Elektro
Depositing User: Perpustakaan Pusat
Date Deposited: 21 Apr 2022 15:07
Last Modified: 25 Aug 2022 09:23
URI: http://eprints.untirta.ac.id/id/eprint/12888

Actions (login required)

View Item View Item