PERENCANAAN DAN PENJADWALAN MANAJEMEN PROYEK RUKO ALBIRU DENGAN SOFTWARE MS. PROJECT DAN PENDEKATAN METODE CRITICAL PATH METHOD

Putrado, Andri (2015) PERENCANAAN DAN PENJADWALAN MANAJEMEN PROYEK RUKO ALBIRU DENGAN SOFTWARE MS. PROJECT DAN PENDEKATAN METODE CRITICAL PATH METHOD. S1 thesis, UNIVERSITAS SULTAN AGENG TIRTAYASA.

[img] Text
PERENCANAAN DAN PENJADWALAN.pdf - Published Version
Restricted to Registered users only

Download (11MB)

Abstract

PT. Agung Mandalika seringkali mendapatkan masalah pekerjaan proyek karena waktu penyelesaian tidak sesuai dengan waktu yang telah disepakati. Pada penelitian ini tujuan yang ingin dicapai diantaranya mengetahui penjadwalan ms. Project dalam yang berguna untuk menjadi acuan dalam mengerjakan tiap-tiap sub bagian pekerjaan sesuai dengan target yang di capai. Kemudian mengetahui cara mempercepat kegiatan ruko Albiru dengan memperhatikan efisiensi biaya sehingga diketahui perbandingan biaya normal dan crashing. Setelah itu mengetahui cara menghitung harga meter persegi bangunan agar menjadi acuan dalam menentukan biaya bangunan. Metode yang digunakan adalah Critical Path Method dan software Ms. Project karena perusahaan belum menggunakan metode tersebut. Hasil perhitungan normal didapatkan bahwa pada jalur kritis A- B-C-D-G-I-K-M-N-O Pekerjaan Bowplank, Pondasi, Rangka Baja, Pekerjaan dinding, Pasang Atap Baja Ringan dan Genteng, Installasi Listrik, Pasang Keramik, Parkir Area dan Finishing. Waktu yang dibutuhkan 343 hari dengan jumlah pekerja 13 orang dan biaya normal adalah Rp 9.296.081.589 atau Rp. 5.709.000/m2 . Sedangkan waktu yang dipercepat dengan hasil jalur kritis tetap sama yaitu A-B-C-D-G-I-K-M-N-O dengan menambah pekerja menjadi 33 orang menjadi 284 hari dan total biaya setelah dipercepat menjadi Rp 9.327.275.000 atau Rp. 5.728.000/m2 . Dengan kata lain pekerjaan dapat lebih dipercepat lagi menjadi 284 hari hal ini akan menjadi pilihan manajemen perusahaan dalam melakukan crushing atau mempercepat waktu proyek. Didapatkan bahwa harga meter persegi bangunan adalah Rp. Rp. 5.728.000/m3.

Item Type: Thesis (S1)
Contributors:
ContributionContributorsNIP/NIM
Thesis advisorUmmi, NurulUNSPECIFIED
Thesis advisorSuparno, SuparnoUNSPECIFIED
Additional Information: PT. Agung Mandalika often get into trouble because the project work completion time is not in accordance with the agreed time. In this study, the objectives of which determine the scheduling ms. Project in handy to be a reference in the work of each sub-section of the work in accordance with the targets achieved. Then find out how to speed up activities Albiru shop with regard to cost efficiency in mind the cost comparison of normal and crashing. After that know how to calculate the price of square meters of buildings in order to become a reference in determining the cost of the building. The method used is the Critical Path Method and software Ms. Project because the company has not used such methods. Normal calculation results showed that the critical path A-B-C-D-G-I-K-M-N-O Bowplank Work, Foundations, Steel Frame, Employment wall, Plug Lightweight steel roof and tiles, Electrical Installation, Plug Ceramic, Parking Area and Finishing. The time it takes 343 days and number of employees 13 people and normal cost is Rp 9,296,081,589 or Rp. 5.709 million / m2 . While time is accelerated with the results of the critical path remains the same, namely A-B-C- D-G-I-K-M-N-O to add workers to 33 people to 284 days and the total cost after accelerated to Rp 9.327.275.000 or Rp. 5.728.000/m2. In other words, the work can be accelerated again to 284 days it will be the choice of the management company in crushing or speed up the project. It was found that the price of a square meter building is Rp. 5.728.000/m2
Uncontrolled Keywords: Kata kunci : CPM, Jalur Kritis, Program Percepatan (Crushing), Microsoft Project
Subjects: H Social Sciences > HD Industries. Land use. Labor
Divisions: 03-Fakultas Teknik > 26201-Jurusan Teknik Industri
Depositing User: Perpustakaan Pusat
Date Deposited: 21 Apr 2022 14:50
Last Modified: 22 Aug 2022 14:22
URI: http://eprints.untirta.ac.id/id/eprint/12732

Actions (login required)

View Item View Item