Search for collections on EPrints Repository UNTIRTA

PENGAWASAN IZIN TRAYEK OLEH DINAS PERHUBUNGAN KOTA CILEGON

Tanini, Elisa and Ismanto, Gandung and Fuad, Anis (2013) PENGAWASAN IZIN TRAYEK OLEH DINAS PERHUBUNGAN KOTA CILEGON. Lainnya thesis, Universitas Sultan Ageng Tirtayasa.

[img]
Preview
Text (Skripsi ANE - Elisa Tanini - 2013)
Skripsi ANE - Elisa Tanini - 2013.pdf - Published Version

Download (6MB) | Preview

Abstract

Elisa Tanini. 6661091419. 2013. Pengawasan Izin Trayek oleh Dinas Perhubungan Kota Cilegon. Program Studi Ilmu Administrasi Negara. Fakultas Ilmu Sosial dan Ilmu Politik. Dosen Pembimbing I: Gandung Ismanto, S.Sos., MM. Dosen Pembimbing II: Anis Fuad, S.Sos., M.Si. Kata Kunci: Pengawasan, IzinTrayek, Dinas Perhubungan Kota Cilegon. Pengawasan izin trayek perlu dilakukan oleh Dinas Perhubungan karena masih banyak angkutan kota yang telat atau tidak melakukan perpanjangan tetapi angkutan kota tersebut masih bisa beroperasi, Apabila angkutan kota tersebut tidak memiliki izin trayek, maka angkutan kota tersebut seharusnya tidak bisa beroperasi. Tujuan penelitian ini untuk mengetahui pengawasan izin trayek oleh Dinas Perhubungan di Kota Cilegon. Teori yang digunakan dalam penelitian ini adalah teori pengawasan dari Djoko Widodo,2007. Metode penelitian yang digunakan yaitu kualitatif dengan teknik purposive dan wawancara mendalam. Hasil penelitian disimpulkan bahwa pengawasan yang dilakukan oleh Dinas Perhubungan Kota Cilegon dinilai masih belum optimal dikarenakan pengawasan khusus yang dilakukan Dinas Perhubungan baru dilakukan sekali dalam setahun, selanjutnya pengawasan rutin yang dilakukan Dinas Perhubungan juga masih belum efektif, kurangnya sumber daya keuangan yang dimiliki oleh Dinas Perhubungan Kota Cilegon serta jadwal pengawasan yang tidak ditentukan secara baku sehingga dapat menyebabkan terganggunya proses pelaksanaan pengawasan. Terdapat beberapa saran yaitu menambah waktu pengawasan khusus yang lebih lama yaitu dari 2 (dua) hari menjadi 8 (delapan) hari setiap setahun sekali agar lebih intensif lagi, mengajukan anggaran untuk diklat pegawai khusus PPNS ke Badan Kepegawaian Daerah supaya jumlah personil PPNS Dinas Perhubungan Kota Cilegon bisa bertambah agar dapat menunjang terhadap pengawasannya kemudian menetapkan jadwal pengawasan secara baku baik pengawasan khusus maupun pengawasan rutin.

Item Type: Thesis (Lainnya)
Additional Information: ABSTRACT : Elisa Tanini. 6661091419. 2013. Supervision by the Department of Transportation Route Permits Cilegon. Public Administration Department. Faculty of Social and Political Science. 1st Advisor: Gandung Ismanto, S.Sos., MM. 2nd Advisor: Anis Fuad, S.Sos., M.Si Keywords: Monitoring, Route Permits, Department of Transportation Cilegon Route permit supervision by the Department of Transportation needs to be done because there are a lot of public transportation are late or do not do an extension, but public transportation is still able to operate. If it does not have a public transportation route permit, the city's public transport should not be able to operate. The purpose of this study to determine the route permit supervision by the Department of Transportation in Cilegon. The theory used in this study is the theory of supervision from Djoko Widodo,2007. The research method used is purposive and qualitative in-depth interviews. The results concluded that the surveillance conducted by the Transportation Office Cilegon is still considered optimal because of special surveillance conducted Transportation Agency recently conducted once a year, routine surveillance conducted subsequent Department of Transportation is still not effective, the lack of financial resources owned by the Department of Transportation and the City of Cilegon monitoring schedule is not determined by default so as to cause the disruption of the implementation of the monitoring process. The recommendation in this research are adding special supervision time is longer than 2 days to 8 days every year to make more intensive, submitted a budget for training specialized personnel staffing agency investigators to the area so that the number of personnel PPNS Cilegon city transportation agencies can grow in order to support to supervision, then set a schedule for monitoring by default both special and regular.
Subjects: H Social Sciences > Public Administration
Divisions: 06-Fakultas Ilmu Sosial dan Ilmu Politik
06-Fakultas Ilmu Sosial dan Ilmu Politik > 63201-Program Studi Administrasi Publik
Depositing User: Admin Eprints Untirta
Date Deposited: 26 Jul 2013 04:01
Last Modified: 26 Jul 2013 04:01
URI: http://eprints.untirta.ac.id/id/eprint/266

Actions (login required)

View Item View Item